- Nation
- Scotland
- Pricing region
- Scotland
- Postcode areas
- G
- Main towns
- Glasgow
What does commercial and above-shop to HMO in Glasgow City involve?
- New electrics, heating and ventilation
- Coordination with planning and building control
- Survey of structure, services and access
- Windows and thermal upgrades
- Sound insulation to floors and party walls
- Separate entrance and protected escape route
Which rules apply in Glasgow City?
- Landlords must also be on the Scottish landlord register, renewed every 3 years.
- Scotland has no C4 use class: up to 5 residents can fall within Class 9 (houses), and HMO planning policy is set by each council, some of which require permission at lower numbers.
- A building warrant may be needed for a change of use or for installing a fire alarm system; check with the council’s building standards service.
- Councils set HMO fire standards through licence conditions, often including emergency lighting in larger HMOs.
- Building standards apply to new partitions and conversions, and councils may set expectations through licence conditions.
How much does commercial and above-shop to HMO cost in Glasgow City?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate) | £3,500 – £6,500 | £3,300 – £6,200 | letting room |
| Panel alarm system (Grade A type), larger HMO | £1,750 – £4,500 | £1,650 – £4,300 | house |
| Acoustic ceiling or floor upgrade, 12–15 m² | £800 – £2,700 | £760 – £2,550 | room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,600 – £17,100 | kitchen |
| Ensuite shower room added to a bedroom | £4,000 – £10,000 | £3,800 – £9,500 | ensuite |
Typical time on site: 12–24 weeks. For a figure for your house, try the guide-price tool.
Commercial and above-shop to HMO by town in Glasgow City
Questions about commercial and above-shop to HMO in Glasgow City
What about the shop below?
The homes above must be separated from the commercial unit by fire-resisting construction, and the escape route must not pass through the shop. We design the separation as part of the building control application.
Is building control needed?
Yes. Changing commercial space to residential use is a material change of use and needs building regulations approval.
Do you carry out commercial and above-shop to HMO across Glasgow City?
Yes, across the whole of Glasgow City, including Glasgow.
Who licenses HMOs in Glasgow City?
Glasgow City council licenses HMOs in its area. Every HMO in Scotland needs a licence.
Other HMO services in Glasgow City
- Large HMO conversions (7+ sharers) in Glasgow City
- Escape routes, emergency lighting and fire stopping in Glasgow City
- Sound insulation in Glasgow City
- EPC and energy upgrades in Glasgow City
- Rewires and EICR remedials in Glasgow City
- Layout changes and room reconfiguration in Glasgow City
- Full HMO refurbishment in Glasgow City
- Fire alarm and detection systems in Glasgow City
