HMORefurbishment

Merseyside, England

Commercial and above-shop to HMO in Southport

Planning commercial and above-shop to HMO in Southport? We survey, price and build HMO works across Southport (PR8) and the rest of Merseyside.

High street building with a shop below and upper floors being refurbished into shared accommodation

A commercial to HMO conversion turns space that was never a home, such as upper floors over shops or small office buildings, into shared accommodation. In Southport, a town of around 90,000 people in Merseyside, the work is planned around the HMO rules for England and the council’s written HMO standards.

Area
Merseyside, England
Postcodes
PR8
Location
15 miles south-west of Preston
Pricing region
North West

What does commercial and above-shop to HMO in Southport involve?

  • Windows and thermal upgrades
  • Survey of structure, services and access
  • New electrics, heating and ventilation
  • Separate entrance and protected escape route
  • Fire separation between the commercial unit and the homes above

Which rules apply in Southport?

Commercial and above-shop to HMO in Southport must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • 7 or more sharers is a sui generis large HMO and normally needs planning permission.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
  • The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.

How much does commercial and above-shop to HMO cost in Southport?

ItemUK typicalLocal guidePer
Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate)£3,500 – £6,500£3,350 – £6,250letting room
Panel alarm system (Grade A type), larger HMO£1,750 – £4,500£1,700 – £4,300house
Acoustic ceiling or floor upgrade, 12–15 m²£800 – £2,700£770 – £2,600room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£7,700 – £17,300kitchen
Ensuite shower room added to a bedroom£4,000 – £10,000£3,850 – £9,600ensuite

These are typical ranges including VAT, adjusted for North West, where costs run below the UK average. The fixed price for a house in Southport follows a site visit.

How long does it take?

Most jobs of this kind take 12–24 weeks. If a council deadline applies in Southport, tell us at the first call so the programme is built around it.

When do Southport landlords need it?

Typical reasons for this work in Southport:

  • Empty upper floors above a shop you own
  • A small office building with planning for residential use

Questions about commercial and above-shop to HMO in Southport

Is building control needed?

Yes. Changing commercial space to residential use is a material change of use and needs building regulations approval.

How far do you travel from Southport?

We cover the whole of Merseyside and work UK-wide. For Southport the nearest towns on our list are Formby (7 miles), Lytham St Annes (7 miles), Ormskirk (8 miles).

Does a shared house in Southport need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much does commercial and above-shop to HMO cost in Southport?

Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Commercial and above-shop to HMO near Southport

Other HMO services in Southport

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote