- Nation
- Scotland
- Pricing region
- Scotland
- Postcode areas
- EH
- Main towns
- Bonnyrigg, Penicuik, Mayfield, Dalkeith
What does commercial and above-shop to HMO in Midlothian involve?
- Sound insulation to floors and party walls
- New electrics, heating and ventilation
- New kitchens, bathrooms and ensuites
- Coordination with planning and building control
- Separate entrance and protected escape route
- Windows and thermal upgrades
Which rules apply in Midlothian?
- Every HMO needs a council licence: 3 or more people who are not all from one or two families, sharing basic amenities. Licences last up to 3 years.
- Scotland has no C4 use class: up to 5 residents can fall within Class 9 (houses), and HMO planning policy is set by each council, some of which require permission at lower numbers.
- A building warrant may be needed for a change of use or for installing a fire alarm system; check with the council’s building standards service.
- The tolerable standard requires interlinked smoke alarms in the main living room and circulation spaces and a heat alarm in the kitchen; licensed HMOs must meet the council’s higher standard.
- Building standards apply to new partitions and conversions, and councils may set expectations through licence conditions.
Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.
How much does commercial and above-shop to HMO cost in Midlothian?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate) | £3,500 – £6,500 | £3,300 – £6,200 | letting room |
| Panel alarm system (Grade A type), larger HMO | £1,750 – £4,500 | £1,650 – £4,300 | house |
| Acoustic ceiling or floor upgrade, 12–15 m² | £800 – £2,700 | £760 – £2,550 | room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,600 – £17,100 | kitchen |
| Ensuite shower room added to a bedroom | £4,000 – £10,000 | £3,800 – £9,500 | ensuite |
Typical time on site: 12–24 weeks. For a figure for your house, try the guide-price tool.
Commercial and above-shop to HMO by town in Midlothian
Questions about commercial and above-shop to HMO in Midlothian
What about the shop below?
The homes above must be separated from the commercial unit by fire-resisting construction, and the escape route must not pass through the shop. We design the separation as part of the building control application.
Do you work on listed or conservation area buildings?
Yes, with the right consents in place. Older high street buildings often need extra care with windows, fire upgrades and sound insulation.
Do you carry out commercial and above-shop to HMO across Midlothian?
Yes, across the whole of Midlothian, including Bonnyrigg, Penicuik, Mayfield.
Who licenses HMOs in Midlothian?
Midlothian council licenses HMOs in its area. Every HMO in Scotland needs a licence.
Other HMO services in Midlothian
- Large HMO conversions (7+ sharers) in Midlothian
- Escape routes, emergency lighting and fire stopping in Midlothian
- Sound insulation in Midlothian
- EPC and energy upgrades in Midlothian
- Rewires and EICR remedials in Midlothian
- Layout changes and room reconfiguration in Midlothian
- Small HMO conversions (3–6 sharers) in Midlothian
- Loft conversions for extra rooms in Midlothian
