HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in High Wycombe (HP11, HP12 and HP13) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have. High Wycombe has a university population, so many shared houses are let to students on yearly tenancies, and summer is the main window for works.
- Area
- Buckinghamshire, England
- Postcodes
- HP11, HP12 and HP13
- Location
- 15 miles north-east of Reading
- Pricing region
- South East
What do rewires and EICR remedials in High Wycombe involve?
- Extra sockets and USB points in rooms
- Consumer unit replacement
- Bathroom and kitchen circuits
- Emergency lighting circuits
- EICR remedial works with confirmation
Which rules apply in High Wycombe?
The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in High Wycombe before we price.
- Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
How much do rewires and EICR remedials cost in High Wycombe?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £170 – £450 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £780 – £1,550 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £6,700 – £13,450 | house |
Prices in High Wycombe are shown with our regional adjustment for South East (above the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.
How long does it take?
Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.
If the house is let to students, we work backwards from the next tenancy start date in High Wycombe.
When do High Wycombe landlords need it?
Typical reasons for this work in High Wycombe:
- Converting or adding rooms
- An EICR with C1, C2 or FI items
Questions about rewires and EICR remedials in High Wycombe
Do you issue certificates?
Yes: installation or minor works certificates and written confirmation of remedials, issued by the qualified electrician who did the work.
Which postcodes in High Wycombe do you work in?
All of them, including HP11, HP12 and HP13, and the surrounding parts of Buckinghamshire.
Where do I check the HMO rules for an address in High Wycombe?
With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.
How much do rewires and EICR remedials cost in High Wycombe?
Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near High Wycombe
- Amersham · 6 mi
- Maidenhead · 7 mi
- Chesham · 8 mi
- Chalfont Saint Peter · 8 mi
- Gerrards Cross · 9 mi
- Slough · 11 mi
- All of Buckinghamshire
Other HMO services in High Wycombe
- Fire alarm and detection systems in High Wycombe
- Licence condition and schedule-of-works in High Wycombe
- Full HMO refurbishment in High Wycombe
- House to HMO conversion in High Wycombe
- Bedroom upgrades and room refits in High Wycombe
- Escape routes, emergency lighting and fire stopping in High Wycombe
- Sound insulation in High Wycombe
- Large HMO conversions (7+ sharers) in High Wycombe
