HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in Bow (E3) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.
- Area
- Greater London, England
- Postcodes
- E3
- Location
- 5 miles east of London
- Council
- London Borough of Tower Hamlets
- Pricing region
- London
What do rewires and EICR remedials in Bow involve?
- Extra sockets and USB points in rooms
- Consumer unit replacement
- Mains-powered alarm circuits
- Emergency lighting circuits
- Electrical installation certificates
Which rules apply in Bow?
Here is what usually applies to a Bow job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
London Borough of Tower Hamlets: local HMO schemes
| Article 4 (HMO) | In force across the council area Borough-wide Article 4 Direction (C3 to C4) since 2021. |
|---|---|
| Additional licensing | In force across the council area Borough-wide additional licensing 1 Apr 2024-31 Mar 2029. |
| Selective licensing | No scheme found |
Schemes change. Check the council’s current pages for the exact address in Bow before you buy or start work. Source: London Borough of Tower Hamlets HMO licensing page, checked 2026-10-31.
How much do rewires and EICR remedials cost in Bow?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £190 – £510 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £900 – £1,800 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £7,700 – £15,350 | house |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Bow can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.
When do Bow landlords need it?
We usually get the call when:
- Converting or adding rooms
- Old wiring or an old fuse board
Questions about rewires and EICR remedials in Bow
How long do I have to fix EICR items?
In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.
Do you cover all of Bow?
Yes. We work across Bow and the E3 postcode areas, plus the rest of Greater London. Nearby places we also cover include Stratford, Canary Wharf, Canning Town.
Which council covers HMOs in Bow?
Bow is covered by London Borough of Tower Hamlets. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.
How much do rewires and EICR remedials cost in Bow?
Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near Bow
- Stratford · 1 mi
- Canary Wharf · 1 mi
- Canning Town · 2 mi
- Leytonstone · 3 mi
- Greenwich · 3 mi
- Islington · 4 mi
- All of Greater London
