HMORefurbishment

Greater London, England

Rewires and EICR remedials in London

Rewires and EICR remedials in London and the EC1A, EC1M, EC1N and EC1R postcode areas, for landlords and investors with shared houses across Greater London. Free site visit, then a fixed written quote.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in London (EC1A, EC1M, EC1N and EC1R) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Greater London, England
Postcodes
EC1A, EC1M, EC1N and EC1R
Pricing region
London

What do rewires and EICR remedials in London involve?

  • Electrical installation certificates
  • EICR remedial works with confirmation
  • Mains-powered alarm circuits
  • Consumer unit replacement
  • Full or partial rewires

Which rules apply in London?

The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in London before we price.

  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in London?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£190 – £510inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£900 – £1,800house
Full rewire, 4–5 bedroom house£6,000 – £12,000£7,700 – £15,350house

These are typical ranges including VAT, adjusted for London, where costs run above the UK average. The fixed price for a house in London follows a site visit.

How long does it take?

Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do London landlords need it?

We usually get the call when:

  • An EICR with C1, C2 or FI items
  • Converting or adding rooms

Questions about rewires and EICR remedials in London

How long do I have to fix EICR items?

In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.

Which postcodes in London do you work in?

All of them, including EC1A, EC1M, EC1N and EC1R, and the surrounding parts of Greater London.

Where do I check the HMO rules for an address in London?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do rewires and EICR remedials cost in London?

Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near London

Other HMO services in London

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote