HMORefurbishment

Greater London, England

Rewires and EICR remedials in South Croydon

Rewires and EICR remedials in South Croydon and the CR0, CR7 and CR8 postcode areas, for landlords and investors with shared houses across Greater London. Free site visit, then a fixed written quote.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. For a house in South Croydon we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Greater London, England
Postcodes
CR0, CR7 and CR8
Location
10 miles south of London
Pricing region
London

What do rewires and EICR remedials in South Croydon involve?

  • Electrical installation certificates
  • Consumer unit replacement
  • Mains-powered alarm circuits
  • Extra sockets and USB points in rooms
  • Bathroom and kitchen circuits

Which rules apply in South Croydon?

Here is what usually applies to a South Croydon job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in South Croydon?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£190 – £510inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£900 – £1,800house
Full rewire, 4–5 bedroom house£6,000 – £12,000£7,700 – £15,350house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in South Croydon can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Most jobs of this kind take 1–7 working days. If a council deadline applies in South Croydon, tell us at the first call so the programme is built around it.

When do South Croydon landlords need it?

We usually get the call when:

  • Old wiring or an old fuse board
  • An EICR with C1, C2 or FI items

Questions about rewires and EICR remedials in South Croydon

How long do I have to fix EICR items?

In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.

Which postcodes in South Croydon do you work in?

All of them, including CR0, CR7 and CR8, and the surrounding parts of Greater London.

Where do I check the HMO rules for an address in South Croydon?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do rewires and EICR remedials cost in South Croydon?

Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near South Croydon

Other HMO services in South Croydon

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote