HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in Salford (M5, M6, M17 and M50) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have. Salford has a university population, so many shared houses are let to students on yearly tenancies, and summer is the main window for works.
- Area
- Greater Manchester, England
- Postcodes
- M5, M6, M17 and M50
- Location
- 2 miles west of Manchester
- Council
- Salford City Council
- Pricing region
- North West
What do rewires and EICR remedials in Salford involve?
- Mains-powered alarm circuits
- EICR remedial works with confirmation
- Bathroom and kitchen circuits
- Consumer unit replacement
- Extra sockets and USB points in rooms
Which rules apply in Salford?
The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Salford before we price.
- Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
- Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
Salford City Council: local HMO schemes
| Article 4 (HMO) | In force in part of the council area Article 4 covers the whole city except Boothstown & Ellenbrook, Cadishead & Lower Irlam and Higher Irlam & Peel Green wards, from 17 Nov 2024 (earlier areas from 2018). |
|---|---|
| Additional licensing | New scheme from 24 Nov 2026 The small-HMO scheme ended on 19 Jul 2026. A new city-wide scheme for converted blocks of flats (section 257 HMOs) only runs from 24 Nov 2026 to 24 Nov 2031. |
| Selective licensing | In force in part of the council area Two schemes: Eccles/Barton/Winton areas 1 Sep 2022-31 Aug 2027; Broughton, Kersal & Broughton Park 21 Jan 2026-20 Jan 2031. |
Schemes change. Check the council’s current pages for the exact address in Salford before you buy or start work. Source: Salford City Council HMO licensing page, checked 2026-10-31.
How much do rewires and EICR remedials cost in Salford?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £140 – £380 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £670 – £1,350 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £5,750 – £11,500 | house |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Salford can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Most jobs of this kind take 1–7 working days. If a council deadline applies in Salford, tell us at the first call so the programme is built around it.
For student houses in Salford, booking by spring is the safest way to make the summer gap.
When do Salford landlords need it?
Landlords in Salford most often ask us for this when:
- Converting or adding rooms
- Old wiring or an old fuse board
Questions about rewires and EICR remedials in Salford
How often does an HMO need an EICR?
At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.
How far do you travel from Salford?
We cover the whole of Greater Manchester and work UK-wide. For Salford the nearest towns on our list are Eccles (2 miles), Old Trafford (2 miles), Manchester (2 miles).
Which council covers HMOs in Salford?
Salford is covered by Salford City Council. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.
How much do rewires and EICR remedials cost in Salford?
Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near Salford
- Eccles · 2 mi
- Old Trafford · 2 mi
- Manchester · 2 mi
- Swinton · 3 mi
- Stretford · 3 mi
- Prestwich · 3 mi
- All of Greater Manchester
Other HMO services in Salford
- Fire alarm and detection systems in Salford
- Licence condition and schedule-of-works in Salford
- Full HMO refurbishment in Salford
- House to HMO conversion in Salford
- Bedroom upgrades and room refits in Salford
- Escape routes, emergency lighting and fire stopping in Salford
- Damp, mould and HHSRS repairs in Salford
- EPC and energy upgrades in Salford
