HMORefurbishment

Merseyside, England

Rewires and EICR remedials in Halewood

Rewires and EICR remedials for shared houses in Halewood: survey, itemised quote, works and a licence-ready handover, covering L24, L25 and L26.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in Halewood (L24, L25 and L26) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Merseyside, England
Postcodes
L24, L25 and L26
Location
7 miles south-east of Liverpool
Pricing region
North West

What do rewires and EICR remedials in Halewood involve?

  • Bathroom and kitchen circuits
  • Mains-powered alarm circuits
  • Consumer unit replacement
  • Extra sockets and USB points in rooms
  • Emergency lighting circuits

Which rules apply in Halewood?

Here is what usually applies to a Halewood job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in Halewood?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£670 – £1,350house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,750 – £11,500house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Halewood can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Halewood landlords need it?

We usually get the call when:

  • An EICR with C1, C2 or FI items
  • Old wiring or an old fuse board

Questions about rewires and EICR remedials in Halewood

How long do I have to fix EICR items?

In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.

How far do you travel from Halewood?

We cover the whole of Merseyside and work UK-wide. For Halewood the nearest towns on our list are Speke (1 miles), Garston (3 miles), Huyton (4 miles).

Where do I check the HMO rules for an address in Halewood?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do rewires and EICR remedials cost in Halewood?

Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Halewood

Other HMO services in Halewood

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote