HMORefurbishment

Wales

Rewires and EICR remedials across Pembrokeshire

Electrical remedial work, consumer units, rewires and certificates for shared houses. Covering all of Pembrokeshire, with a free site visit and fixed written quote.

Electrician fitting a new metal consumer unit with RCBOs
In short: HMO electrical works keep the wiring in a shared house safe and certificated. Across Pembrokeshire, the work is planned around Wales’s HMO rules and the standards the local council publishes.
Nation
Wales
Pricing region
Wales
Postcode areas
SA
Main towns
Haverfordwest, Milford Haven

What do rewires and EICR remedials in Pembrokeshire involve?

  • Full or partial rewires
  • Consumer unit replacement
  • Mains-powered alarm circuits
  • Electrical installation certificates
  • Emergency lighting circuits
  • EICR remedial works with confirmation

Which rules apply in Pembrokeshire?

  • An electrical inspection and test at least every 5 years, with the report given to the contract-holder within 14 days.
  • Mandatory licence for HMOs with 3 or more storeys and 5 or more people in 2 or more households; Wales did not adopt England’s 2018 change.
  • Councils such as Cardiff and Swansea run additional licensing for HMOs outside the mandatory scheme.
  • Landlords must register with Rent Smart Wales, and those who manage their own lets need a Rent Smart Wales licence.

Welsh councils set their own HMO standards and may run additional licensing. In Wales, changing a house to a C4 HMO always needs planning permission, so check planning first.

How much do rewires and EICR remedials cost in Pembrokeshire?

Regional adjustment for Wales. Planning budgets: see our prices page.
ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£660 – £1,300house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,650 – £11,300house

Typical time on site: 1–7 working days. For a figure for your house, try the guide-price tool.

Rewires and EICR remedials by town in Pembrokeshire

Questions about rewires and EICR remedials in Pembrokeshire

How often does an HMO need an EICR?

At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.

Is a full rewire disruptive?

Yes. It means lifting floorboards and chasing walls, so it is best done in an empty house or room by room during voids.

Do you carry out rewires and EICR remedials across Pembrokeshire?

Yes, across the whole of Pembrokeshire, including Haverfordwest, Milford Haven.

Who licenses HMOs in Pembrokeshire?

Pembrokeshire council licenses HMOs in its area. Landlords must also register with Rent Smart Wales.

Other HMO services in Pembrokeshire

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote