HMORefurbishment

Scottish Borders, Scotland

Rewires and EICR remedials in Hawick

Rewires and EICR remedials in Hawick and the TD9 postcode areas, for landlords and investors with shared houses across Scottish Borders. Free site visit, then a fixed written quote.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Hawick is 40 miles south-east of Edinburgh. We price rewires and EICR remedials there against Scotland’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Scottish Borders, Scotland
Postcodes
TD9
Location
40 miles south-east of Edinburgh
Pricing region
Scotland

What do rewires and EICR remedials in Hawick involve?

  • Extra sockets and USB points in rooms
  • Full or partial rewires
  • EICR remedial works with confirmation
  • Consumer unit replacement
  • Bathroom and kitchen circuits

Which rules apply in Hawick?

Here is what usually applies to a Hawick job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • An EICR before the first let and at least every 5 years, with C1 and C2 items fixed, PAT testing of supplied appliances and RCD protection.
  • Landlords must also be on the Scottish landlord register, renewed every 3 years.

How much do rewires and EICR remedials cost in Hawick?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£660 – £1,350house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,700 – £11,400house

These are typical ranges including VAT, adjusted for Scotland, where costs run below the UK average. The fixed price for a house in Hawick follows a site visit.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Hawick landlords need it?

Landlords in Hawick most often ask us for this when:

  • Old wiring or an old fuse board
  • An EICR with C1, C2 or FI items

Questions about rewires and EICR remedials in Hawick

Is a full rewire disruptive?

Yes. It means lifting floorboards and chasing walls, so it is best done in an empty house or room by room during voids.

Which postcodes in Hawick do you work in?

All of them, including TD9, and the surrounding parts of Scottish Borders.

Where do I check the HMO rules for an address in Hawick?

With the local council for the address. Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.

How much do rewires and EICR remedials cost in Hawick?

Our guide ranges for Scotland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Hawick

Other HMO services in Hawick

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote