HMORefurbishment

Gloucestershire, England

EPC and energy upgrades in Tewkesbury

We carry out EPC and energy upgrades in Tewkesbury, 36 miles south of Birmingham, working to the HMO rules that apply in England and to the council’s written HMO standards.

Insulated plasterboard being fitted to an external wall beside a new sash window and radiator

HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. For a house in Tewkesbury we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Gloucestershire, England
Postcodes
GL19 and GL20
Location
36 miles south of Birmingham
Pricing region
South West

What do EPC and energy upgrades in Tewkesbury involve?

  • LED lighting
  • Ventilation to control condensation
  • Review of the EPC recommendations
  • Heating, hot water and smart controls
  • Double or secondary glazing

Which rules apply in Tewkesbury?

Here is what usually applies to a Tewkesbury job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Rented homes must currently meet at least EPC E, with a £3,500 spending cap. The government plans EPC C by October 2030, subject to legislation.
  • Councils assess hazards, including damp, mould and fire, under the HHSRS; revised regulations and guidance applied from 23 June 2026.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.

How much do EPC and energy upgrades cost in Tewkesbury?

ItemUK typicalLocal guidePer
Loft insulation, whole house£650 – £1,250£680 – £1,300house
Internal wall insulation£60 – £100£60 – £100m² of wall

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Tewkesbury can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Typical time on site: 2–15 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Tewkesbury landlords need it?

Landlords in Tewkesbury most often ask us for this when:

  • An EPC below the required minimum
  • Planning ahead for higher standards

Questions about EPC and energy upgrades in Tewkesbury

What EPC does a rented HMO need?

In England and Wales most lets must currently reach at least EPC E, and the government plans EPC C in England by 2030, subject to legislation. How an HMO is let can affect how the EPC rules apply, so check the current guidance for your property.

Which postcodes in Tewkesbury do you work in?

All of them, including GL19 and GL20, and the surrounding parts of Gloucestershire.

Does a shared house in Tewkesbury need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do EPC and energy upgrades cost in Tewkesbury?

Our guide ranges for South West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

EPC and energy upgrades near Tewkesbury

Other HMO services in Tewkesbury

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote