HMORefurbishment

Hampshire, England

EPC and energy upgrades in Bordon

EPC and energy upgrades for shared houses in Bordon: survey, itemised quote, works and a licence-ready handover, covering GU35.

Insulated plasterboard being fitted to an external wall beside a new sash window and radiator

HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. For a house in Bordon we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Hampshire, England
Postcodes
GU35
Location
24 miles south of Reading
Pricing region
South East

What do EPC and energy upgrades in Bordon involve?

  • Ventilation to control condensation
  • Double or secondary glazing
  • Heating, hot water and smart controls
  • LED lighting
  • Loft and roof insulation

Which rules apply in Bordon?

EPC and energy upgrades in Bordon must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Rented homes must currently meet at least EPC E, with a £3,500 spending cap. The government plans EPC C by October 2030, subject to legislation.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.
  • Building regulations cover structural changes, new partitions, ensuite drainage, fire-resisting construction and notifiable electrical work.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.

How much do EPC and energy upgrades cost in Bordon?

ItemUK typicalLocal guidePer
Loft insulation, whole house£650 – £1,250£730 – £1,400house
Internal wall insulation£60 – £100£70 – £110m² of wall

Prices in Bordon are shown with our regional adjustment for South East (above the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Typical time on site: 2–15 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Bordon landlords need it?

Typical reasons for this work in Bordon:

  • Planning ahead for higher standards
  • An EPC below the required minimum

Questions about EPC and energy upgrades in Bordon

Are there grants?

Some schemes support landlords. Eligibility changes, so check the current government and energy company schemes for your nation.

Do you cover all of Bordon?

Yes. We work across Bordon and the GU35 postcode areas, plus the rest of Hampshire. Nearby places we also cover include Farnham, Aldershot, Fleet.

Does a shared house in Bordon need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do EPC and energy upgrades cost in Bordon?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

EPC and energy upgrades near Bordon

Other HMO services in Bordon

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote