HMORefurbishment

Warwickshire, England

EPC and energy upgrades in Warwick

We carry out EPC and energy upgrades in Warwick, 9 miles south of Coventry, working to the HMO rules that apply in England and to the council’s written HMO standards.

Insulated plasterboard being fitted to an external wall beside a new sash window and radiator

HMO energy upgrades improve the energy performance certificate (EPC) rating and cut running costs: loft and wall insulation, heating and controls, glazing, ventilation and lighting. Warwick is 9 miles south of Coventry. We price EPC and energy upgrades there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Warwickshire, England
Postcodes
CV32, CV34 and CV35
Location
9 miles south of Coventry
Pricing region
West Midlands

What do EPC and energy upgrades in Warwick involve?

  • Internal or external wall insulation
  • Review of the EPC recommendations
  • A post-works EPC through your assessor
  • Loft and roof insulation
  • Double or secondary glazing

Which rules apply in Warwick?

EPC and energy upgrades in Warwick must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Rented homes must currently meet at least EPC E, with a £3,500 spending cap. The government plans EPC C by October 2030, subject to legislation.
  • Councils assess hazards, including damp, mould and fire, under the HHSRS; revised regulations and guidance applied from 23 June 2026.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.

How much do EPC and energy upgrades cost in Warwick?

ItemUK typicalLocal guidePer
Loft insulation, whole house£650 – £1,250£650 – £1,250house
Internal wall insulation£60 – £100£60 – £100m² of wall

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Warwick can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Typical time on site: 2–15 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Warwick landlords need it?

Landlords in Warwick most often ask us for this when:

  • High bills in an all-inclusive rent
  • Planning ahead for higher standards

Questions about EPC and energy upgrades in Warwick

What EPC does a rented HMO need?

In England and Wales most lets must currently reach at least EPC E, and the government plans EPC C in England by 2030, subject to legislation. How an HMO is let can affect how the EPC rules apply, so check the current guidance for your property.

Do you cover all of Warwick?

Yes. We work across Warwick and the CV32, CV34 and CV35 postcode areas, plus the rest of Warwickshire. Nearby places we also cover include Royal Leamington Spa, Kenilworth, Stratford-upon-Avon.

Does a shared house in Warwick need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do EPC and energy upgrades cost in Warwick?

Our guide ranges for West Midlands are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

EPC and energy upgrades near Warwick

Other HMO services in Warwick

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote