HMORefurbishment

Berkshire, England

HMO fire safety upgrades in Slough

HMO fire safety upgrades in Slough and the SL1 postcode areas, for landlords and investors with shared houses across Berkshire. Free site visit, then a fixed written quote.

Refurbished staircase and landing with fire doors and emergency lighting forming a protected route

HMO fire safety upgrades bring a shared house up to the fire standard its size and layout need. Landlords in Slough (SL1) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Berkshire, England
Postcodes
SL1
Location
17 miles east of Reading
Pricing region
South East

What do HMO fire safety upgrades in Slough involve?

  • Commissioning certificates and a handover pack
  • Fire stopping of service holes
  • Fire doors with closers and seals
  • Thumb-turn locks on exit doors
  • Fire-resisting linings to the escape route

Which rules apply in Slough?

HMO fire safety upgrades in Slough must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.
  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • Building regulations cover structural changes, new partitions, ensuite drainage, fire-resisting construction and notifiable electrical work.
  • Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.

How much do HMO fire safety upgrades cost in Slough?

ItemUK typicalLocal guidePer
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£900 – £2,250house
Panel alarm system (Grade A type), larger HMO£1,750 – £4,500£1,950 – £5,050house
FD30S fire door leaf into an existing frame, with seals, closer and hinges, fitted£300 – £600£340 – £670door
New FD30S fire doorset with frame, fitted£600 – £1,300£670 – £1,450door
Protected route upgrades: fire-resisting linings, fire stopping, lighting (three-storey house, our estimate)£2,000 – £6,000£2,250 – £6,700house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Slough can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Typical time on site: 3–10 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Slough landlords need it?

Landlords in Slough most often ask us for this when:

  • A council inspection or licence condition
  • Converting a house to an HMO

Questions about HMO fire safety upgrades in Slough

Who writes the fire risk assessment?

You arrange it, through a competent assessor. We price and carry out the works it recommends and give you the evidence.

Which postcodes in Slough do you work in?

All of them, including SL1, and the surrounding parts of Berkshire.

Where do I check the HMO rules for an address in Slough?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do HMO fire safety upgrades cost in Slough?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

HMO fire safety upgrades near Slough

Other HMO services in Slough

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote