What does house to HMO conversion in County Down involve?
- Rewiring or upgrades, with an electrical certificate
- Extra bathrooms, shower rooms or ensuites
- Measured survey and room-size check against the licensing standards
- Fire doors, fire-rated linings and an interlinked fire alarm
- Decoration, flooring and a handover pack for licensing
- New stud walls, door openings and room splits
Which rules apply in County Down?
- Licences usually last 5 years, and landlords must also register with the NI landlord registration scheme.
- Space and amenity standards come from the HMO (Living Accommodation Standard) Regulations (NI) 2019 and the licence conditions.
- Kitchens, bathrooms and WCs must meet the 2019 living accommodation standard regulations and licence conditions.
- All new HMOs need planning permission; councils such as Belfast apply HMO policy areas and limits on concentration.
- New HMOs need building control approval as well as planning permission.
In Northern Ireland, licensing is run centrally by the NI HMO Unit, and all new HMOs need planning permission and building control approval from the local council.
How much does house to HMO conversion cost in County Down?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Typical 3–4 bed house to a 5–6 bed HMO, all-in | £30,000 – £75,000 | £27,000 – £67,500 | project |
| Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate) | £3,500 – £6,500 | £3,150 – £5,850 | letting room |
| Ensuite shower room added to a bedroom | £4,000 – £10,000 | £3,600 – £9,000 | ensuite |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,200 – £16,200 | kitchen |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £720 – £1,800 | house |
Typical time on site: 6–14 weeks. For a figure for your house, try the guide-price tool.
House to HMO conversion by town in County Down
Questions about house to HMO conversion in County Down
How long does a house to HMO conversion take?
Most conversions of a three or four-bedroom house take six to fourteen weeks on site, after drawings and any approvals. Bigger layout changes, extensions or loft rooms add time.
Do you carry out house to HMO conversion across County Down?
Yes, across the whole of County Down, including Bangor (County Down), Banbridge, Holywood.
Who licenses HMOs in County Down?
HMO licensing in County Down, as everywhere in Northern Ireland, is run by the NI HMO Unit at Belfast City Council. Planning and building control are handled by the local council.
Other HMO services in County Down
- Small HMO conversions (3–6 sharers) in County Down
- Large HMO conversions (7+ sharers) in County Down
- HMO fire safety upgrades in County Down
- Ensuite installation in County Down
- Communal kitchen refits in County Down
- Layout changes and room reconfiguration in County Down
- Sound insulation in County Down
- Commercial and above-shop to HMO in County Down