- Nation
- Northern Ireland
- Pricing region
- Northern Ireland
- Postcode areas
- BT
- Main towns
- Omagh, Strabane
What does house to HMO conversion in County Tyrone involve?
- A communal kitchen sized for the number of sharers
- Decoration, flooring and a handover pack for licensing
- Fire doors, fire-rated linings and an interlinked fire alarm
- Extra bathrooms, shower rooms or ensuites
- Rewiring or upgrades, with an electrical certificate
- Layout drawings showing bedrooms, kitchens, bathrooms and the escape route
Which rules apply in County Tyrone?
- A licence is needed where 3 or more people forming more than two households live as their main home and pay rent; the NI HMO Unit at Belfast City Council licenses for every council.
- Space and amenity standards come from the HMO (Living Accommodation Standard) Regulations (NI) 2019 and the licence conditions.
- Kitchens, bathrooms and WCs must meet the 2019 living accommodation standard regulations and licence conditions.
- All new HMOs need planning permission; councils such as Belfast apply HMO policy areas and limits on concentration.
- New HMOs need building control approval as well as planning permission.
In Northern Ireland, licensing is run centrally by the NI HMO Unit, and all new HMOs need planning permission and building control approval from the local council.
How much does house to HMO conversion cost in County Tyrone?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Typical 3–4 bed house to a 5–6 bed HMO, all-in | £30,000 – £75,000 | £27,000 – £67,500 | project |
| Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate) | £3,500 – £6,500 | £3,150 – £5,850 | letting room |
| Ensuite shower room added to a bedroom | £4,000 – £10,000 | £3,600 – £9,000 | ensuite |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,200 – £16,200 | kitchen |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £720 – £1,800 | house |
Typical time on site: 6–14 weeks. For a figure for your house, try the guide-price tool.
House to HMO conversion by town in County Tyrone
Questions about house to HMO conversion in County Tyrone
How long does a house to HMO conversion take?
Most conversions of a three or four-bedroom house take six to fourteen weeks on site, after drawings and any approvals. Bigger layout changes, extensions or loft rooms add time.
Do you carry out house to HMO conversion across County Tyrone?
Yes, across the whole of County Tyrone, including Omagh, Strabane.
Who licenses HMOs in County Tyrone?
HMO licensing in County Tyrone, as everywhere in Northern Ireland, is run by the NI HMO Unit at Belfast City Council. Planning and building control are handled by the local council.
Other HMO services in County Tyrone
- Small HMO conversions (3–6 sharers) in County Tyrone
- Large HMO conversions (7+ sharers) in County Tyrone
- HMO fire safety upgrades in County Tyrone
- Ensuite installation in County Tyrone
- Communal kitchen refits in County Tyrone
- Layout changes and room reconfiguration in County Tyrone
- Professional and co-living HMO refurbs in County Tyrone
- Fire doors in County Tyrone
