- Nation
- Scotland
- Pricing region
- Scotland
- Postcode areas
- AB
- Main towns
- Aberdeen
What do large HMO conversions (7+ sharers) in Aberdeen City involve?
- Emergency lighting where the escape route needs it
- Protected stair and landing with fire doors and fire stopping
- Feasibility review and measured survey
- Planning and building control drawings, coordinated with your designer
- Ensuites or extra bathrooms
- Sound insulation between rooms and floors
Which rules apply in Aberdeen City?
- Every HMO needs a council licence: 3 or more people who are not all from one or two families, sharing basic amenities. Licences last up to 3 years.
- Room sizes are set by each council; East Lothian, for example, uses 6.5 m² for a single room with a shared lounge and kitchen, and 10 m² without.
- Kitchen, WC and bathroom ratios come from council standards; one WC and one bath or shower per 5 people is a common figure.
- Scotland has no C4 use class: up to 5 residents can fall within Class 9 (houses), and HMO planning policy is set by each council, some of which require permission at lower numbers.
- A building warrant may be needed for a change of use or for installing a fire alarm system; check with the council’s building standards service.
How much do large HMO conversions (7+ sharers) cost in Aberdeen City?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate) | £3,500 – £6,500 | £3,300 – £6,200 | letting room |
| Panel alarm system (Grade A type), larger HMO | £1,750 – £4,500 | £1,650 – £4,300 | house |
| Protected route upgrades: fire-resisting linings, fire stopping, lighting (three-storey house, our estimate) | £2,000 – £6,000 | £1,900 – £5,700 | house |
| Ensuite shower room added to a bedroom | £4,000 – £10,000 | £3,800 – £9,500 | ensuite |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,600 – £17,100 | kitchen |
Typical time on site: 10–20 weeks. For a figure for your house, try the guide-price tool.
Large HMO conversions (7+ sharers) by town in Aberdeen City
Questions about large HMO conversions (7+ sharers) in Aberdeen City
Can you work with my architect?
Yes. We often build from an architect’s drawings, or we can recommend a designer to prepare them.
Do you handle building control?
Yes. The building work in a large HMO conversion (partitions, fire separation, drainage, electrics) needs to meet the building regulations, and the conversion can also count as a material change of use. We confirm the route with building control, coordinate inspections and give you the completion paperwork.
Do you carry out large HMO conversions (7+ sharers) across Aberdeen City?
Yes, across the whole of Aberdeen City, including Aberdeen.
Who licenses HMOs in Aberdeen City?
Aberdeen City council licenses HMOs in its area. Every HMO in Scotland needs a licence.
Other HMO services in Aberdeen City
- House to HMO conversion in Aberdeen City
- Escape routes, emergency lighting and fire stopping in Aberdeen City
- Fire alarm and detection systems in Aberdeen City
- Sound insulation in Aberdeen City
- Loft conversions for extra rooms in Aberdeen City
- Extensions for extra rooms in Aberdeen City
- Communal kitchen refits in Aberdeen City
- Student HMO refurbishment in Aberdeen City
