A large HMO is a shared house for seven or more people. In Huntingdon, a town of about 24,000 people in Cambridgeshire, the work is planned around the HMO rules for England and the council’s written HMO standards.
- Area
- Cambridgeshire, England
- Postcodes
- PE26, PE27, PE28 and PE29
- Location
- 16 miles north-west of Cambridge
- Pricing region
- East of England
What do large HMO conversions (7+ sharers) in Huntingdon involve?
- Second kitchen or extra kitchen capacity
- Fire alarm and detection system sized for the building
- Ensuites or extra bathrooms
- Emergency lighting where the escape route needs it
- Protected stair and landing with fire doors and fire stopping
Which rules apply in Huntingdon?
Large HMO conversions (7+ sharers) in Huntingdon must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- Floor area under a ceiling lower than 1.5 m does not count towards the room size, and many councils set larger sizes.
- Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
- 7 or more sharers is a sui generis large HMO and normally needs planning permission.
How much do large HMO conversions (7+ sharers) cost in Huntingdon?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate) | £3,500 – £6,500 | £3,700 – £6,900 | letting room |
| Panel alarm system (Grade A type), larger HMO | £1,750 – £4,500 | £1,850 – £4,750 | house |
| Protected route upgrades: fire-resisting linings, fire stopping, lighting (three-storey house, our estimate) | £2,000 – £6,000 | £2,100 – £6,350 | house |
| Ensuite shower room added to a bedroom | £4,000 – £10,000 | £4,250 – £10,600 | ensuite |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £8,500 – £19,100 | kitchen |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Huntingdon can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Most jobs of this kind take 10–20 weeks. If a council deadline applies in Huntingdon, tell us at the first call so the programme is built around it.
When do Huntingdon landlords need it?
Typical reasons for this work in Huntingdon:
- An existing large HMO needs works before a licence renewal
- A large house, three or more storeys, or a building with lots of rooms
Questions about large HMO conversions (7+ sharers) in Huntingdon
Does a seven-bed HMO need planning permission?
In England, normally yes: seven or more unrelated sharers is a sui generis use outside class C4. Wales and Northern Ireland require permission for new HMOs anyway, and in Scotland more than five residents falls outside the houses class. Councils also apply concentration policies, so we check the address first.
Do you cover all of Huntingdon?
Yes. We work across Huntingdon and the PE26, PE27, PE28 and PE29 postcode areas, plus the rest of Cambridgeshire. Nearby places we also cover include Saint Neots, Cambridge, Peterborough.
Does a shared house in Huntingdon need an HMO licence?
In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.
How much do large HMO conversions (7+ sharers) cost in Huntingdon?
Our guide ranges for East of England are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Large HMO conversions (7+ sharers) near Huntingdon
- Saint Neots · 9 mi
- Cambridge · 16 mi
- Peterborough · 17 mi
- Rushden · 18 mi
- Bedford · 18 mi
- March · 19 mi
- All of Cambridgeshire
Other HMO services in Huntingdon
- House to HMO conversion in Huntingdon
- Escape routes, emergency lighting and fire stopping in Huntingdon
- Fire alarm and detection systems in Huntingdon
- Sound insulation in Huntingdon
- Loft conversions for extra rooms in Huntingdon
- Extensions for extra rooms in Huntingdon
- Bedroom upgrades and room refits in Huntingdon
- EPC and energy upgrades in Huntingdon
