HMORefurbishment

England · North West

Large HMO conversions (7+ sharers) across Merseyside

Conversions for seven or more sharers, including planning drawings, building control and bigger fire systems. Covering all of Merseyside, with a free site visit and fixed written quote.

Three-storey house under full scaffolding with guardrails and brick guards during refurbishment works
In short: A large HMO is a shared house for seven or more people. Across Merseyside, the work is planned around England’s HMO rules and the standards the local council publishes.
Nation
England
Pricing region
North West
Postcode areas
L, CH, WA, PR
Main towns
Liverpool, Birkenhead, St Helens, Southport, Wallasey

What do large HMO conversions (7+ sharers) in Merseyside involve?

  • Protected stair and landing with fire doors and fire stopping
  • Feasibility review and measured survey
  • Sound insulation between rooms and floors
  • Planning and building control drawings, coordinated with your designer
  • Second kitchen or extra kitchen capacity
  • Ensuites or extra bathrooms

Which rules apply in Merseyside?

  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • Licensed HMOs must meet national minimum bedroom sizes: 6.51 m² for one person aged 10 or over, 10.22 m² for two, and 4.64 m² for a child under 10.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • 7 or more sharers is a sui generis large HMO and normally needs planning permission.
  • A conversion can be a material change of use under the building regulations, so confirm with building control before work starts.

Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do large HMO conversions (7+ sharers) cost in Merseyside?

Regional adjustment for North West. Planning budgets: see our prices page.
ItemUK typicalLocal guidePer
Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate)£3,500 – £6,500£3,350 – £6,250letting room
Panel alarm system (Grade A type), larger HMO£1,750 – £4,500£1,700 – £4,300house
Protected route upgrades: fire-resisting linings, fire stopping, lighting (three-storey house, our estimate)£2,000 – £6,000£1,900 – £5,750house
Ensuite shower room added to a bedroom£4,000 – £10,000£3,850 – £9,600ensuite
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£7,700 – £17,300kitchen

Typical time on site: 10–20 weeks. For a figure for your house, try the guide-price tool.

Large HMO conversions (7+ sharers) by town in Merseyside

Questions about large HMO conversions (7+ sharers) in Merseyside

Can you work with my architect?

Yes. We often build from an architect’s drawings, or we can recommend a designer to prepare them.

What fire alarm does a large HMO need?

The fire risk assessment and the council decide; alarm grades come from guidance, not statute. For larger HMOs, council guides and the NI fire service guide commonly point to a Grade A panel system covering escape routes and rooms. We fit to the specification set, and give you the commissioning certificate.

Do you carry out large HMO conversions (7+ sharers) across Merseyside?

Yes, across the whole of Merseyside, including Liverpool, Birkenhead, St Helens.

Who licenses HMOs in Merseyside?

HMOs in Merseyside are licensed by the local council for the address. Where an area has several councils, each runs its own licensing and planning policies.

Other HMO services in Merseyside

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote