- Nation
- Scotland
- Pricing region
- Scotland
- Postcode areas
- TD, EH, ML
- Main towns
- Hawick
What do large HMO conversions (7+ sharers) in Scottish Borders involve?
- Emergency lighting where the escape route needs it
- Protected stair and landing with fire doors and fire stopping
- Second kitchen or extra kitchen capacity
- Feasibility review and measured survey
- Fire alarm and detection system sized for the building
- Ensuites or extra bathrooms
Which rules apply in Scottish Borders?
- Every HMO needs a council licence: 3 or more people who are not all from one or two families, sharing basic amenities. Licences last up to 3 years.
- Room sizes are set by each council; East Lothian, for example, uses 6.5 m² for a single room with a shared lounge and kitchen, and 10 m² without.
- Kitchen, WC and bathroom ratios come from council standards; one WC and one bath or shower per 5 people is a common figure.
- Scotland has no C4 use class: up to 5 residents can fall within Class 9 (houses), and HMO planning policy is set by each council, some of which require permission at lower numbers.
- A building warrant may be needed for a change of use or for installing a fire alarm system; check with the council’s building standards service.
Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.
How much do large HMO conversions (7+ sharers) cost in Scottish Borders?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate) | £3,500 – £6,500 | £3,300 – £6,200 | letting room |
| Panel alarm system (Grade A type), larger HMO | £1,750 – £4,500 | £1,650 – £4,300 | house |
| Protected route upgrades: fire-resisting linings, fire stopping, lighting (three-storey house, our estimate) | £2,000 – £6,000 | £1,900 – £5,700 | house |
| Ensuite shower room added to a bedroom | £4,000 – £10,000 | £3,800 – £9,500 | ensuite |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,600 – £17,100 | kitchen |
Typical time on site: 10–20 weeks. For a figure for your house, try the guide-price tool.
Large HMO conversions (7+ sharers) by town in Scottish Borders
Questions about large HMO conversions (7+ sharers) in Scottish Borders
Do you handle building control?
Yes. The building work in a large HMO conversion (partitions, fire separation, drainage, electrics) needs to meet the building regulations, and the conversion can also count as a material change of use. We confirm the route with building control, coordinate inspections and give you the completion paperwork.
What fire alarm does a large HMO need?
The fire risk assessment and the council decide; alarm grades come from guidance, not statute. For larger HMOs, council guides and the NI fire service guide commonly point to a Grade A panel system covering escape routes and rooms. We fit to the specification set, and give you the commissioning certificate.
Do you carry out large HMO conversions (7+ sharers) across Scottish Borders?
Yes, across the whole of Scottish Borders, including Hawick.
Who licenses HMOs in Scottish Borders?
Scottish Borders council licenses HMOs in its area. Every HMO in Scotland needs a licence.
Other HMO services in Scottish Borders
- House to HMO conversion in Scottish Borders
- Escape routes, emergency lighting and fire stopping in Scottish Borders
- Fire alarm and detection systems in Scottish Borders
- Sound insulation in Scottish Borders
- Loft conversions for extra rooms in Scottish Borders
- Extensions for extra rooms in Scottish Borders
- Rewires and EICR remedials in Scottish Borders
- Damp, mould and HHSRS repairs in Scottish Borders
