- Nation
- Scotland
- Pricing region
- Scotland
- Postcode areas
- EH, TD
- Main towns
- Musselburgh
What does commercial and above-shop to HMO in East Lothian involve?
- Separate entrance and protected escape route
- New kitchens, bathrooms and ensuites
- Sound insulation to floors and party walls
- New electrics, heating and ventilation
- Survey of structure, services and access
- Coordination with planning and building control
Which rules apply in East Lothian?
- Every HMO needs a council licence: 3 or more people who are not all from one or two families, sharing basic amenities. Licences last up to 3 years.
- Scotland has no C4 use class: up to 5 residents can fall within Class 9 (houses), and HMO planning policy is set by each council, some of which require permission at lower numbers.
- A building warrant may be needed for a change of use or for installing a fire alarm system; check with the council’s building standards service.
- The tolerable standard requires interlinked smoke alarms in the main living room and circulation spaces and a heat alarm in the kitchen; licensed HMOs must meet the council’s higher standard.
- Building standards apply to new partitions and conversions, and councils may set expectations through licence conditions.
Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.
How much does commercial and above-shop to HMO cost in East Lothian?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Conversion works per letting room (walls, linings, electrics, decoration; excludes kitchens, bathrooms and fire systems; our estimate) | £3,500 – £6,500 | £3,300 – £6,200 | letting room |
| Panel alarm system (Grade A type), larger HMO | £1,750 – £4,500 | £1,650 – £4,300 | house |
| Acoustic ceiling or floor upgrade, 12–15 m² | £800 – £2,700 | £760 – £2,550 | room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,600 – £17,100 | kitchen |
| Ensuite shower room added to a bedroom | £4,000 – £10,000 | £3,800 – £9,500 | ensuite |
Typical time on site: 12–24 weeks. For a figure for your house, try the guide-price tool.
Commercial and above-shop to HMO by town in East Lothian
Questions about commercial and above-shop to HMO in East Lothian
Is building control needed?
Yes. Changing commercial space to residential use is a material change of use and needs building regulations approval.
Do you work on listed or conservation area buildings?
Yes, with the right consents in place. Older high street buildings often need extra care with windows, fire upgrades and sound insulation.
Do you carry out commercial and above-shop to HMO across East Lothian?
Yes, across the whole of East Lothian, including Musselburgh.
Who licenses HMOs in East Lothian?
East Lothian council licenses HMOs in its area. Every HMO in Scotland needs a licence.
Other HMO services in East Lothian
- Large HMO conversions (7+ sharers) in East Lothian
- Escape routes, emergency lighting and fire stopping in East Lothian
- Sound insulation in East Lothian
- EPC and energy upgrades in East Lothian
- Rewires and EICR remedials in East Lothian
- Layout changes and room reconfiguration in East Lothian
- Bedroom upgrades and room refits in East Lothian
- Small HMO conversions (3–6 sharers) in East Lothian
