HMORefurbishment

East Riding of Yorkshire, England

Full HMO refurbishment in Kingston upon Hull

Full HMO refurbishment for shared houses in Kingston upon Hull: survey, itemised quote, works and a licence-ready handover, covering HU1, HU2, HU3 and HU4.

Refurbished communal lounge and dining area in a shared house

A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. In Kingston upon Hull, a city of around 300,000 people in East Riding of Yorkshire, the work is planned around the HMO rules for England and the council’s written HMO standards. Kingston upon Hull has a university population, so many shared houses are let to students on yearly tenancies, and summer is the main window for works.

Area
East Riding of Yorkshire, England
Postcodes
HU1, HU2, HU3 and HU4
Location
50 miles east of Leeds
Council
Hull City Council
Pricing region
Yorkshire and the Humber

What does full HMO refurbishment in Kingston upon Hull involve?

  • Damp and mould repairs
  • Decoration, flooring and furniture-ready rooms
  • Strip-out and making good
  • Rewire or electrical upgrades
  • New or refitted kitchens and bathrooms

Which rules apply in Kingston upon Hull?

Here is what usually applies to a Kingston upon Hull job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
  • National rules ask for an adequate number of bathrooms, WCs and basins and suitably located kitchens; numeric ratios are set by each council.
  • Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.

Hull City Council: local HMO schemes

Article 4 (HMO)In force in part of the council area Article 4 area introduced Oct 2013 and expanded 8 Aug 2019 (Beverley Road South, Spring Bank, Anlaby Road, Hessle Road NaSA area, Holderness Road west of Maybury Road).
Additional licensingNo scheme found
Selective licensingNo scheme found

Schemes change. Check the council’s current pages for the exact address in Kingston upon Hull before you buy or start work. Source: Hull City Council HMO licensing page, checked 2026-10-31.

How much does full HMO refurbishment cost in Kingston upon Hull?

ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£3,800 – £8,550letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£7,600 – £17,100kitchen
Shared bathroom refit£5,500 – £9,000£5,200 – £8,550bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£760 – £1,900house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,700 – £11,400house

These are typical ranges including VAT, adjusted for Yorkshire and the Humber, where costs run below the UK average. The fixed price for a house in Kingston upon Hull follows a site visit.

How long does it take?

Allow 4–12 weeks on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

For student houses in Kingston upon Hull, booking by spring is the safest way to make the summer gap.

When do Kingston upon Hull landlords need it?

Typical reasons for this work in Kingston upon Hull:

  • You have bought an existing HMO that needs work
  • A council inspection or licence renewal has listed defects

Questions about full HMO refurbishment in Kingston upon Hull

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

Do you cover all of Kingston upon Hull?

Yes. We work across Kingston upon Hull and the HU1, HU2, HU3 and HU4 postcode areas, plus the rest of East Riding of Yorkshire. Nearby places we also cover include Beverley, Grimsby, Scunthorpe.

Which council covers HMOs in Kingston upon Hull?

Kingston upon Hull is covered by Hull City Council. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.

How much does full HMO refurbishment cost in Kingston upon Hull?

Our guide ranges for Yorkshire and the Humber are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Full HMO refurbishment near Kingston upon Hull

Other HMO services in Kingston upon Hull

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote