- Nation
- Wales
- Pricing region
- Wales
- Postcode areas
- CH, LL
- Main towns
- Buckley, Deeside, Flint, Hawarden
What does full HMO refurbishment in Flintshire involve?
- Damp and mould repairs
- New or refitted kitchens and bathrooms
- Fire doors, detection and escape route upgrades
- Heating and hot water upgrades
- Condition survey and schedule of works
- Rewire or electrical upgrades
Which rules apply in Flintshire?
- Councils such as Cardiff and Swansea run additional licensing for HMOs outside the mandatory scheme.
- Kitchen and bathroom ratios are set in each council’s HMO standards.
- Council HMO standards and the fire risk assessment set detection, fire doors and escape routes.
- An electrical inspection and test at least every 5 years, with the report given to the contract-holder within 14 days.
- Councils assess hazards, including damp and mould, under the HHSRS, alongside the fitness for human habitation rules for occupation contracts.
Welsh councils set their own HMO standards and may run additional licensing. In Wales, changing a house to a C4 HMO always needs planning permission, so check planning first.
How much does full HMO refurbishment cost in Flintshire?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £3,750 – £8,450 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,500 – £16,900 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £5,150 – £8,450 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £750 – £1,900 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £5,650 – £11,300 | house |
Typical time on site: 4–12 weeks. For a figure for your house, try the guide-price tool.
Full HMO refurbishment by town in Flintshire
Questions about full HMO refurbishment in Flintshire
How much does a full HMO refurbishment cost?
It depends on size and condition. Our guide prices page shows typical UK ranges per room and per square metre, and we give a fixed written quote after a site visit.
Will you deal with the council’s list of works?
Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.
Do you carry out full HMO refurbishment across Flintshire?
Yes, across the whole of Flintshire, including Buckley, Deeside, Flint.
Who licenses HMOs in Flintshire?
Flintshire council licenses HMOs in its area. Landlords must also register with Rent Smart Wales.
Other HMO services in Flintshire
- Void and between-tenancy refurbs in Flintshire
- HMO fire safety upgrades in Flintshire
- Rewires and EICR remedials in Flintshire
- Communal kitchen refits in Flintshire
- Shared bathroom and shower room refits in Flintshire
- Damp, mould and HHSRS repairs in Flintshire
- Loft conversions for extra rooms in Flintshire
- Extensions for extra rooms in Flintshire
