HMORefurbishment

Greater London, England

Full HMO refurbishment in Canning Town

Full HMO refurbishment in Canning Town and the E13, E14 and E16 postcode areas, for landlords and investors with shared houses across Greater London. Free site visit, then a fixed written quote.

Refurbished communal lounge and dining area in a shared house

A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. For a house in Canning Town we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Greater London, England
Postcodes
E13, E14 and E16
Location
6 miles east of London
Council
London Borough of Newham
Pricing region
London

What does full HMO refurbishment in Canning Town involve?

  • Damp and mould repairs
  • Condition survey and schedule of works
  • New or refitted kitchens and bathrooms
  • Decoration, flooring and furniture-ready rooms
  • Strip-out and making good

Which rules apply in Canning Town?

The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Canning Town before we price.

  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • National rules ask for an adequate number of bathrooms, WCs and basins and suitably located kitchens; numeric ratios are set by each council.
  • Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.

London Borough of Newham: local HMO schemes

Article 4 (HMO)In force across the council area Borough-wide Article 4 Direction (C3 to C4) since 31 Jul 2013.
Additional licensingIn force in part of the council area Additional licensing in 22 of 24 wards (all except Royal Victoria and Stratford Olympic Park) 1 Jan 2023-31 Dec 2027.
Selective licensingIn force in part of the council area Selective licensing in the same 22 wards from 1 Jun 2023 to 31 May 2028.

Schemes change. Check the council’s current pages for the exact address in Canning Town before you buy or start work. Source: London Borough of Newham HMO licensing page, checked 2026-10-31.

How much does full HMO refurbishment cost in Canning Town?

ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£5,100 – £11,500letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£10,250 – £23,050kitchen
Shared bathroom refit£5,500 – £9,000£7,050 – £11,500bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£1,000 – £2,550house
Full rewire, 4–5 bedroom house£6,000 – £12,000£7,700 – £15,350house

These are typical ranges including VAT, adjusted for London, where costs run above the UK average. The fixed price for a house in Canning Town follows a site visit.

How long does it take?

Typical time on site: 4–12 weeks. We agree the programme with you before starting and send photo updates as the work progresses.

When do Canning Town landlords need it?

We usually get the call when:

  • A house that has been let hard for years
  • You have bought an existing HMO that needs work

Questions about full HMO refurbishment in Canning Town

Will you deal with the council’s list of works?

Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.

How far do you travel from Canning Town?

We cover the whole of Greater London and work UK-wide. For Canning Town the nearest towns on our list are Stratford (2 miles), Bow (2 miles), Canary Wharf (2 miles).

Which council covers HMOs in Canning Town?

Canning Town is covered by London Borough of Newham. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.

How much does full HMO refurbishment cost in Canning Town?

Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Full HMO refurbishment near Canning Town

Other HMO services in Canning Town

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote