HMORefurbishment

Greater Manchester, England

Full HMO refurbishment in Altrincham

Full HMO refurbishment in Altrincham and the WA14 and WA15 postcode areas, for landlords and investors with shared houses across Greater Manchester. Free site visit, then a fixed written quote.

Refurbished communal lounge and dining area in a shared house

A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. In Altrincham, a town of around 50,000 people in Greater Manchester, the work is planned around the HMO rules for England and the council’s written HMO standards.

Area
Greater Manchester, England
Postcodes
WA14 and WA15
Location
8 miles south-west of Manchester
Pricing region
North West

What does full HMO refurbishment in Altrincham involve?

  • Fire doors, detection and escape route upgrades
  • Heating and hot water upgrades
  • Damp and mould repairs
  • New or refitted kitchens and bathrooms
  • Strip-out and making good

Which rules apply in Altrincham?

Here is what usually applies to a Altrincham job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.
  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.

How much does full HMO refurbishment cost in Altrincham?

ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£3,850 – £8,650letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£7,700 – £17,300kitchen
Shared bathroom refit£5,500 – £9,000£5,300 – £8,650bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£770 – £1,900house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,750 – £11,500house

These are typical ranges including VAT, adjusted for North West, where costs run below the UK average. The fixed price for a house in Altrincham follows a site visit.

How long does it take?

Typical time on site: 4–12 weeks. We agree the programme with you before starting and send photo updates as the work progresses.

When do Altrincham landlords need it?

We usually get the call when:

  • A council inspection or licence renewal has listed defects
  • You have bought an existing HMO that needs work

Questions about full HMO refurbishment in Altrincham

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

Which postcodes in Altrincham do you work in?

All of them, including WA14 and WA15, and the surrounding parts of Greater Manchester.

Where do I check the HMO rules for an address in Altrincham?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much does full HMO refurbishment cost in Altrincham?

Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Full HMO refurbishment near Altrincham

Other HMO services in Altrincham

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote