- Nation
- Scotland
- Pricing region
- Scotland
- Postcode areas
- PA
- Main towns
- Greenock, Port Glasgow
What does full HMO refurbishment in Inverclyde involve?
- Fire doors, detection and escape route upgrades
- New or refitted kitchens and bathrooms
- Heating and hot water upgrades
- Rewire or electrical upgrades
- Condition survey and schedule of works
- Strip-out and making good
Which rules apply in Inverclyde?
- Landlords must also be on the Scottish landlord register, renewed every 3 years.
- Kitchen, WC and bathroom ratios come from council standards; one WC and one bath or shower per 5 people is a common figure.
- Councils set HMO fire standards through licence conditions, often including emergency lighting in larger HMOs.
- An EICR before the first let and at least every 5 years, with C1 and C2 items fixed, PAT testing of supplied appliances and RCD protection.
- Awaab’s Law applies to most private tenancies from 6 October 2026: damp and mould reports must be investigated within 10 working days, and repairs to substantial damp or mould must start within 5 working days.
Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.
How much does full HMO refurbishment cost in Inverclyde?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £3,800 – £8,550 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,600 – £17,100 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £5,200 – £8,550 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £760 – £1,900 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £5,700 – £11,400 | house |
Typical time on site: 4–12 weeks. For a figure for your house, try the guide-price tool.
Full HMO refurbishment by town in Inverclyde
Questions about full HMO refurbishment in Inverclyde
How much does a full HMO refurbishment cost?
It depends on size and condition. Our guide prices page shows typical UK ranges per room and per square metre, and we give a fixed written quote after a site visit.
Can you refurbish an HMO while tenants live there?
Sometimes, room by room, with the escape route kept clear and the fire alarm working at all times. For heavier work it is usually quicker and safer to do it with the house empty. We plan the phasing with you.
Do you carry out full HMO refurbishment across Inverclyde?
Yes, across the whole of Inverclyde, including Greenock, Port Glasgow.
Who licenses HMOs in Inverclyde?
Inverclyde council licenses HMOs in its area. Every HMO in Scotland needs a licence.
Other HMO services in Inverclyde
- Void and between-tenancy refurbs in Inverclyde
- HMO fire safety upgrades in Inverclyde
- Rewires and EICR remedials in Inverclyde
- Communal kitchen refits in Inverclyde
- Shared bathroom and shower room refits in Inverclyde
- Damp, mould and HHSRS repairs in Inverclyde
- Professional and co-living HMO refurbs in Inverclyde
- Student HMO refurbishment in Inverclyde
