HMORefurbishment

England · South East

Full HMO refurbishment across Isle of Wight

Stripping out and refurbishing a tired or failing shared house from top to bottom. Covering all of Isle of Wight, with a free site visit and fixed written quote.

Refurbished communal lounge and dining area in a shared house
In short: A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. We carry this out across Isle of Wight, priced against the HMO rules for England and the council’s own standards.
Nation
England
Pricing region
South East
Postcode areas
PO
Main towns
Newport (Isle of Wight), Ryde, Cowes, Sandown

What does full HMO refurbishment in Isle of Wight involve?

  • New or refitted kitchens and bathrooms
  • Rewire or electrical upgrades
  • Condition survey and schedule of works
  • Decoration, flooring and furniture-ready rooms
  • Heating and hot water upgrades
  • Fire doors, detection and escape route upgrades

Which rules apply in Isle of Wight?

  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • National rules ask for an adequate number of bathrooms, WCs and basins and suitably located kitchens; numeric ratios are set by each council.
  • The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.
  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.

Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much does full HMO refurbishment cost in Isle of Wight?

Regional adjustment for South East. Planning budgets: see our prices page.
ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£4,500 – £10,100letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£8,950 – £20,150kitchen
Shared bathroom refit£5,500 – £9,000£6,150 – £10,100bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£900 – £2,250house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,700 – £13,450house

Typical time on site: 4–12 weeks. For a figure for your house, try the guide-price tool.

Full HMO refurbishment by town in Isle of Wight

Questions about full HMO refurbishment in Isle of Wight

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

Will you deal with the council’s list of works?

Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.

Do you carry out full HMO refurbishment across Isle of Wight?

Yes, across the whole of Isle of Wight, including Newport (Isle of Wight), Ryde, Cowes.

Who licenses HMOs in Isle of Wight?

HMOs in Isle of Wight are licensed by the local council for the address. Where an area has several councils, each runs its own licensing and planning policies.

Other HMO services in Isle of Wight

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote