HMORefurbishment

Kent, England

Full HMO refurbishment in Faversham

Full HMO refurbishment in Faversham and the ME13 postcode areas, for landlords and investors with shared houses across Kent. Free site visit, then a fixed written quote.

Refurbished communal lounge and dining area in a shared house

A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Faversham is 46 miles east of London. We price full HMO refurbishment there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Kent, England
Postcodes
ME13
Location
46 miles east of London
Pricing region
South East

What does full HMO refurbishment in Faversham involve?

  • Strip-out and making good
  • Decoration, flooring and furniture-ready rooms
  • Fire doors, detection and escape route upgrades
  • Condition survey and schedule of works
  • Damp and mould repairs

Which rules apply in Faversham?

Here is what usually applies to a Faversham job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • Smoke alarms on every storey with living accommodation and CO alarms by fixed combustion appliances (other than gas cookers) are required by law.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.

How much does full HMO refurbishment cost in Faversham?

ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£4,500 – £10,100letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£8,950 – £20,150kitchen
Shared bathroom refit£5,500 – £9,000£6,150 – £10,100bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£900 – £2,250house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,700 – £13,450house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Faversham can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Allow 4–12 weeks on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Faversham landlords need it?

Typical reasons for this work in Faversham:

  • A house that has been let hard for years
  • You have bought an existing HMO that needs work

Questions about full HMO refurbishment in Faversham

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

Which postcodes in Faversham do you work in?

All of them, including ME13, and the surrounding parts of Kent.

Where do I check the HMO rules for an address in Faversham?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much does full HMO refurbishment cost in Faversham?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Full HMO refurbishment near Faversham

Other HMO services in Faversham

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote