HMORefurbishment

Lancashire, England

Full HMO refurbishment in Fylde

Full HMO refurbishment in Fylde and the FY6, PR3 and PR4 postcode areas, for landlords and investors with shared houses across Lancashire. Free site visit, then a fixed written quote.

Refurbished communal lounge and dining area in a shared house

A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. Landlords in Fylde (FY6, PR3 and PR4) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Lancashire, England
Postcodes
FY6, PR3 and PR4
Location
10 miles north-west of Preston
Pricing region
North West

What does full HMO refurbishment in Fylde involve?

  • New or refitted kitchens and bathrooms
  • Rewire or electrical upgrades
  • Fire doors, detection and escape route upgrades
  • Decoration, flooring and furniture-ready rooms
  • Damp and mould repairs

Which rules apply in Fylde?

The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Fylde before we price.

  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • The Fire Safety Order 2005 applies to the common parts of HMOs, enforced by the fire and rescue authority.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.

How much does full HMO refurbishment cost in Fylde?

ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£3,850 – £8,650letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£7,700 – £17,300kitchen
Shared bathroom refit£5,500 – £9,000£5,300 – £8,650bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£770 – £1,900house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,750 – £11,500house

Prices in Fylde are shown with our regional adjustment for North West (below the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Typical time on site: 4–12 weeks. We agree the programme with you before starting and send photo updates as the work progresses.

When do Fylde landlords need it?

We usually get the call when:

  • A council inspection or licence renewal has listed defects
  • A house that has been let hard for years

Questions about full HMO refurbishment in Fylde

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

Which postcodes in Fylde do you work in?

All of them, including FY6, PR3 and PR4, and the surrounding parts of Lancashire.

Where do I check the HMO rules for an address in Fylde?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much does full HMO refurbishment cost in Fylde?

Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Full HMO refurbishment near Fylde

Other HMO services in Fylde

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote