- Nation
- Wales
- Pricing region
- Wales
- Postcode areas
- SA
- Main towns
- Neath, Briton Ferry
What does full HMO refurbishment in Neath Port Talbot involve?
- Heating and hot water upgrades
- Fire doors, detection and escape route upgrades
- Condition survey and schedule of works
- Damp and mould repairs
- Strip-out and making good
- New or refitted kitchens and bathrooms
Which rules apply in Neath Port Talbot?
- Councils such as Cardiff and Swansea run additional licensing for HMOs outside the mandatory scheme.
- Kitchen and bathroom ratios are set in each council’s HMO standards.
- Fitness for human habitation rules require mains-powered, interlinked smoke alarms on every storey and CO alarms where there is a gas, oil or solid-fuel appliance.
- An electrical inspection and test at least every 5 years, with the report given to the contract-holder within 14 days.
- Councils assess hazards, including damp and mould, under the HHSRS, alongside the fitness for human habitation rules for occupation contracts.
Welsh councils set their own HMO standards and may run additional licensing. In Wales, changing a house to a C4 HMO always needs planning permission, so check planning first.
How much does full HMO refurbishment cost in Neath Port Talbot?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £3,750 – £8,450 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,500 – £16,900 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £5,150 – £8,450 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £750 – £1,900 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £5,650 – £11,300 | house |
Typical time on site: 4–12 weeks. For a figure for your house, try the guide-price tool.
Full HMO refurbishment by town in Neath Port Talbot
Questions about full HMO refurbishment in Neath Port Talbot
Will you deal with the council’s list of works?
Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.
How much does a full HMO refurbishment cost?
It depends on size and condition. Our guide prices page shows typical UK ranges per room and per square metre, and we give a fixed written quote after a site visit.
Do you carry out full HMO refurbishment across Neath Port Talbot?
Yes, across the whole of Neath Port Talbot, including Neath, Briton Ferry.
Who licenses HMOs in Neath Port Talbot?
Neath Port Talbot council licenses HMOs in its area. Landlords must also register with Rent Smart Wales.
Other HMO services in Neath Port Talbot
- Void and between-tenancy refurbs in Neath Port Talbot
- HMO fire safety upgrades in Neath Port Talbot
- Rewires and EICR remedials in Neath Port Talbot
- Communal kitchen refits in Neath Port Talbot
- Shared bathroom and shower room refits in Neath Port Talbot
- Damp, mould and HHSRS repairs in Neath Port Talbot
- Sound insulation in Neath Port Talbot
- Student HMO refurbishment in Neath Port Talbot
