- Nation
- England
- Pricing region
- North East
- Postcode areas
- NE, TD, DH, CA
- Main towns
- Blyth, Cramlington, Ashington
What does full HMO refurbishment in Northumberland involve?
- Rewire or electrical upgrades
- Strip-out and making good
- New or refitted kitchens and bathrooms
- Heating and hot water upgrades
- Damp and mould repairs
- Condition survey and schedule of works
Which rules apply in Northumberland?
- Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
- Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
- Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Councils can fine up to £7,000 where a Category 1 hazard is not removed when it reasonably could have been.
Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.
How much does full HMO refurbishment cost in Northumberland?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate) | £4,000 – £9,000 | £3,700 – £8,300 | letting room |
| Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges) | £8,000 – £18,000 | £7,350 – £16,550 | kitchen |
| Shared bathroom refit | £5,500 – £9,000 | £5,050 – £8,300 | bathroom |
| Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides) | £800 – £2,000 | £740 – £1,850 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £5,500 – £11,050 | house |
Typical time on site: 4–12 weeks. For a figure for your house, try the guide-price tool.
Full HMO refurbishment by town in Northumberland
Questions about full HMO refurbishment in Northumberland
Can you refurbish an HMO while tenants live there?
Sometimes, room by room, with the escape route kept clear and the fire alarm working at all times. For heavier work it is usually quicker and safer to do it with the house empty. We plan the phasing with you.
Will you deal with the council’s list of works?
Yes. If you have a schedule of works or an improvement notice, we price against it item by item and give you evidence of completion.
Do you carry out full HMO refurbishment across Northumberland?
Yes, across the whole of Northumberland, including Blyth, Cramlington, Ashington.
Who licenses HMOs in Northumberland?
HMOs in Northumberland are licensed by the local council for the address. Where an area has several councils, each runs its own licensing and planning policies.
Other HMO services in Northumberland
- Void and between-tenancy refurbs in Northumberland
- HMO fire safety upgrades in Northumberland
- Rewires and EICR remedials in Northumberland
- Communal kitchen refits in Northumberland
- Shared bathroom and shower room refits in Northumberland
- Damp, mould and HHSRS repairs in Northumberland
- Commercial and above-shop to HMO in Northumberland
- Fire alarm and detection systems in Northumberland
