HMORefurbishment

Somerset, England

Full HMO refurbishment in Taunton

Full HMO refurbishment in Taunton and the TA1 postcode areas, for landlords and investors with shared houses across Somerset. Free site visit, then a fixed written quote.

Refurbished communal lounge and dining area in a shared house

A full HMO refurbishment brings a tired or non-compliant shared house back up to standard in one project: strip-out, repairs, new kitchens and bathrooms, fire safety, electrics, heating, decoration and flooring. For a house in Taunton we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Somerset, England
Postcodes
TA1
Location
27 miles north-east of Exeter
Pricing region
South West

What does full HMO refurbishment in Taunton involve?

  • Damp and mould repairs
  • Fire doors, detection and escape route upgrades
  • Condition survey and schedule of works
  • Strip-out and making good
  • Decoration, flooring and furniture-ready rooms

Which rules apply in Taunton?

Here is what usually applies to a Taunton job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
  • Council standards often step up at 5 and 6 sharers, for example a separate WC at 5 and a second bathroom from 6.
  • Fire precautions follow a risk assessment; the LACORS Housing – Fire Safety guide (2008) is guidance, not law, but many councils base their standards on it.
  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.

How much does full HMO refurbishment cost in Taunton?

ItemUK typicalLocal guidePer
Full refurbishment per letting room, with a share of communal areas (excludes kitchens, bathrooms and fire systems; our estimate)£4,000 – £9,000£4,150 – £9,350letting room
Communal HMO kitchen with extra cooking and sink capacity (our estimate from domestic ranges)£8,000 – £18,000£8,300 – £18,700kitchen
Shared bathroom refit£5,500 – £9,000£5,700 – £9,350bathroom
Interlinked mains alarm system (Grade D type), small HMO (our estimate from installer guides)£800 – £2,000£830 – £2,100house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,250 – £12,500house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Taunton can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Typical time on site: 4–12 weeks. We agree the programme with you before starting and send photo updates as the work progresses.

When do Taunton landlords need it?

Typical reasons for this work in Taunton:

  • A council inspection or licence renewal has listed defects
  • You have bought an existing HMO that needs work

Questions about full HMO refurbishment in Taunton

Do you provide certificates at the end?

Yes: electrical and fire alarm certificates, and building control completion where it applies.

How far do you travel from Taunton?

We cover the whole of Somerset and work UK-wide. For Taunton the nearest towns on our list are Bridgwater (9 miles), Burnham-on-Sea (16 miles), Tiverton (19 miles).

Where do I check the HMO rules for an address in Taunton?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much does full HMO refurbishment cost in Taunton?

Our guide ranges for South West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Full HMO refurbishment near Taunton

Other HMO services in Taunton

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote