HMO electrical works keep the wiring in a shared house safe and certificated. Aberdeen is in Scotland. We price rewires and EICR remedials there against Scotland’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for. Aberdeen has a university population, so many shared houses are let to students on yearly tenancies, and summer is the main window for works.
- Area
- Aberdeen City, Scotland
- Postcodes
- AB10, AB11, AB12 and AB24
- Council
- Aberdeen City Council
- Pricing region
- Scotland
What do rewires and EICR remedials in Aberdeen involve?
- EICR remedial works with confirmation
- Mains-powered alarm circuits
- Consumer unit replacement
- Extra sockets and USB points in rooms
- Full or partial rewires
Which rules apply in Aberdeen?
Here is what usually applies to a Aberdeen job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- An EICR before the first let and at least every 5 years, with C1 and C2 items fixed, PAT testing of supplied appliances and RCD protection.
- Every HMO needs a council licence: 3 or more people who are not all from one or two families, sharing basic amenities. Licences last up to 3 years.
- Landlords must also be on the Scottish landlord register, renewed every 3 years.
How much do rewires and EICR remedials cost in Aberdeen?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £140 – £380 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £660 – £1,350 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £5,700 – £11,400 | house |
Prices in Aberdeen are shown with our regional adjustment for Scotland (below the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.
How long does it take?
Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.
For student houses in Aberdeen, booking by spring is the safest way to make the summer gap.
When do Aberdeen landlords need it?
We usually get the call when:
- Old wiring or an old fuse board
- An EICR with C1, C2 or FI items
Questions about rewires and EICR remedials in Aberdeen
How often does an HMO need an EICR?
At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.
How far do you travel from Aberdeen?
We cover the whole of Aberdeen City and work UK-wide. For Aberdeen the nearest towns on our list are Nigg (2 miles), Westhill (7 miles), Inverurie (14 miles).
Which council covers HMOs in Aberdeen?
Aberdeen is covered by Aberdeen City Council. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.
How much do rewires and EICR remedials cost in Aberdeen?
Our guide ranges for Scotland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near Aberdeen
- Nigg · 2 mi
- Westhill · 7 mi
- Inverurie · 14 mi
- Peterhead · 28 mi
- Fraserburgh · 38 mi
- Arbroath · 44 mi
- All of Aberdeen City
Other HMO services in Aberdeen
- Fire alarm and detection systems in Aberdeen
- Licence condition and schedule-of-works in Aberdeen
- Full HMO refurbishment in Aberdeen
- House to HMO conversion in Aberdeen
- Bedroom upgrades and room refits in Aberdeen
- Escape routes, emergency lighting and fire stopping in Aberdeen
- Damp, mould and HHSRS repairs in Aberdeen
- Student HMO refurbishment in Aberdeen
