HMORefurbishment

Aberdeenshire, Scotland

Rewires and EICR remedials in Westhill

We carry out rewires and EICR remedials in Westhill, 7 miles west of Aberdeen, working to the HMO rules that apply in Scotland and to the council’s written HMO standards.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. For a house in Westhill we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Aberdeenshire, Scotland
Postcodes
AB32
Location
7 miles west of Aberdeen
Pricing region
Scotland

What do rewires and EICR remedials in Westhill involve?

  • Full or partial rewires
  • Consumer unit replacement
  • Mains-powered alarm circuits
  • Extra sockets and USB points in rooms
  • Bathroom and kitchen circuits

Which rules apply in Westhill?

The rules below are the Scotland-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Westhill before we price.

  • An EICR before the first let and at least every 5 years, with C1 and C2 items fixed, PAT testing of supplied appliances and RCD protection.
  • Every HMO needs a council licence: 3 or more people who are not all from one or two families, sharing basic amenities. Licences last up to 3 years.
  • Landlords must also be on the Scottish landlord register, renewed every 3 years.

How much do rewires and EICR remedials cost in Westhill?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£660 – £1,350house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,700 – £11,400house

These are typical ranges including VAT, adjusted for Scotland, where costs run below the UK average. The fixed price for a house in Westhill follows a site visit.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Westhill landlords need it?

We usually get the call when:

  • Old wiring or an old fuse board
  • Converting or adding rooms

Questions about rewires and EICR remedials in Westhill

How often does an HMO need an EICR?

At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.

How far do you travel from Westhill?

We cover the whole of Aberdeenshire and work UK-wide. For Westhill the nearest towns on our list are Aberdeen (7 miles), Nigg (7 miles), Inverurie (10 miles).

Where do I check the HMO rules for an address in Westhill?

With the local council for the address. Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.

How much do rewires and EICR remedials cost in Westhill?

Our guide ranges for Scotland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Westhill

Other HMO services in Westhill

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote