HMORefurbishment

Blaenau Gwent, Wales

Rewires and EICR remedials in Tredegar

We carry out rewires and EICR remedials in Tredegar, 20 miles north of Cardiff, working to the HMO rules that apply in Wales and to the council’s written HMO standards.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. In Tredegar, a town of about 15,000 people in Blaenau Gwent, the work is planned around the HMO rules for Wales and the council’s written HMO standards.

Area
Blaenau Gwent, Wales
Postcodes
CF81, NP22, NP23 and NP24
Location
20 miles north of Cardiff
Pricing region
Wales

What do rewires and EICR remedials in Tredegar involve?

  • EICR remedial works with confirmation
  • Emergency lighting circuits
  • Full or partial rewires
  • Extra sockets and USB points in rooms
  • Mains-powered alarm circuits

Which rules apply in Tredegar?

Here is what usually applies to a Tredegar job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • An electrical inspection and test at least every 5 years, with the report given to the contract-holder within 14 days.
  • Councils such as Cardiff and Swansea run additional licensing for HMOs outside the mandatory scheme.
  • Landlords must register with Rent Smart Wales, and those who manage their own lets need a Rent Smart Wales licence.

How much do rewires and EICR remedials cost in Tredegar?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£660 – £1,300house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,650 – £11,300house

These are typical ranges including VAT, adjusted for Wales, where costs run below the UK average. The fixed price for a house in Tredegar follows a site visit.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Tredegar landlords need it?

Landlords in Tredegar most often ask us for this when:

  • Converting or adding rooms
  • Old wiring or an old fuse board

Questions about rewires and EICR remedials in Tredegar

How often does an HMO need an EICR?

At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.

How far do you travel from Tredegar?

We cover the whole of Blaenau Gwent and work UK-wide. For Tredegar the nearest towns on our list are Ebbw Vale (2 miles), Brynmawr (3 miles), Merthyr Tydfil (6 miles).

Does a shared house in Tredegar need an HMO licence?

In Wales, mandatory licensing covers HMOs of 3 or more storeys with 5 or more people. Many councils, including Cardiff and Swansea, also run additional licensing for smaller HMOs. Every landlord must register with Rent Smart Wales.

How much do rewires and EICR remedials cost in Tredegar?

Our guide ranges for Wales are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Tredegar

Other HMO services in Tredegar

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote