HMORefurbishment

Caerphilly, Wales

Rewires and EICR remedials in Bargoed

Planning rewires and EICR remedials in Bargoed? We survey, price and build HMO works across Bargoed (CF81, CF82 and NP12) and the rest of Caerphilly.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. For a house in Bargoed we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Caerphilly, Wales
Postcodes
CF81, CF82 and NP12
Location
14 miles north of Cardiff
Pricing region
Wales

What do rewires and EICR remedials in Bargoed involve?

  • Bathroom and kitchen circuits
  • Emergency lighting circuits
  • Consumer unit replacement
  • Extra sockets and USB points in rooms
  • Electrical installation certificates

Which rules apply in Bargoed?

Here is what usually applies to a Bargoed job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • An electrical inspection and test at least every 5 years, with the report given to the contract-holder within 14 days.
  • Mandatory licence for HMOs with 3 or more storeys and 5 or more people in 2 or more households; Wales did not adopt England’s 2018 change.
  • Councils such as Cardiff and Swansea run additional licensing for HMOs outside the mandatory scheme.
  • Landlords must register with Rent Smart Wales, and those who manage their own lets need a Rent Smart Wales licence.

How much do rewires and EICR remedials cost in Bargoed?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£660 – £1,300house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,650 – £11,300house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Bargoed can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Bargoed landlords need it?

We usually get the call when:

  • An EICR with C1, C2 or FI items
  • Old wiring or an old fuse board

Questions about rewires and EICR remedials in Bargoed

Do you issue certificates?

Yes: installation or minor works certificates and written confirmation of remedials, issued by the qualified electrician who did the work.

Which postcodes in Bargoed do you work in?

All of them, including CF81, CF82 and NP12, and the surrounding parts of Caerphilly.

Does a shared house in Bargoed need an HMO licence?

In Wales, mandatory licensing covers HMOs of 3 or more storeys with 5 or more people. Many councils, including Cardiff and Swansea, also run additional licensing for smaller HMOs. Every landlord must register with Rent Smart Wales.

How much do rewires and EICR remedials cost in Bargoed?

Our guide ranges for Wales are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Bargoed

Other HMO services in Bargoed

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote