- Nation
- England
- Pricing region
- East of England
- Postcode areas
- CB, PE, SG
- Main towns
- Peterborough, Cambridge, Wisbech, Saint Neots, Huntingdon
What do rewires and EICR remedials in Cambridgeshire involve?
- Mains-powered alarm circuits
- Electrical installation certificates
- Emergency lighting circuits
- Extra sockets and USB points in rooms
- Consumer unit replacement
- Bathroom and kitchen circuits
Which rules apply in Cambridgeshire?
- Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
- Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.
How much do rewires and EICR remedials cost in Cambridgeshire?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £160 – £420 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £740 – £1,500 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £6,350 – £12,700 | house |
Typical time on site: 1–7 working days. For a figure for your house, try the guide-price tool.
Rewires and EICR remedials by town in Cambridgeshire
Questions about rewires and EICR remedials in Cambridgeshire
How often does an HMO need an EICR?
At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.
How long do I have to fix EICR items?
In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.
Do you carry out rewires and EICR remedials across Cambridgeshire?
Yes, across the whole of Cambridgeshire, including Peterborough, Cambridge, Wisbech.
Who licenses HMOs in Cambridgeshire?
HMOs in Cambridgeshire are licensed by the local council for the address. Where an area has several councils, each runs its own licensing and planning policies.
Other HMO services in Cambridgeshire
- Fire alarm and detection systems in Cambridgeshire
- Licence condition and schedule-of-works in Cambridgeshire
- Full HMO refurbishment in Cambridgeshire
- House to HMO conversion in Cambridgeshire
- Bedroom upgrades and room refits in Cambridgeshire
- Escape routes, emergency lighting and fire stopping in Cambridgeshire
- Layout changes and room reconfiguration in Cambridgeshire
- Ensuite installation in Cambridgeshire
