HMO electrical works keep the wiring in a shared house safe and certificated. For a house in March we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.
- Area
- Cambridgeshire, England
- Postcodes
- PE15
- Location
- 14 miles east of Peterborough
- Pricing region
- East of England
What do rewires and EICR remedials in March involve?
- EICR remedial works with confirmation
- Emergency lighting circuits
- Consumer unit replacement
- Mains-powered alarm circuits
- Full or partial rewires
Which rules apply in March?
Here is what usually applies to a March job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
- Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
How much do rewires and EICR remedials cost in March?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £160 – £420 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £740 – £1,500 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £6,350 – £12,700 | house |
Prices in March are shown with our regional adjustment for East of England (above the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.
How long does it take?
Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.
When do March landlords need it?
Typical reasons for this work in March:
- An EICR with C1, C2 or FI items
- Old wiring or an old fuse board
Questions about rewires and EICR remedials in March
How long do I have to fix EICR items?
In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.
Do you cover all of March?
Yes. We work across March and the PE15 postcode areas, plus the rest of Cambridgeshire. Nearby places we also cover include Wisbech, Ely, Peterborough.
Where do I check the HMO rules for an address in March?
With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.
How much do rewires and EICR remedials cost in March?
Our guide ranges for East of England are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near March
- Wisbech · 8 mi
- Ely · 13 mi
- Peterborough · 14 mi
- King's Lynn · 19 mi
- Spalding · 19 mi
- Huntingdon · 19 mi
- All of Cambridgeshire
Other HMO services in March
- Fire alarm and detection systems in March
- Licence condition and schedule-of-works in March
- Full HMO refurbishment in March
- House to HMO conversion in March
- Bedroom upgrades and room refits in March
- Escape routes, emergency lighting and fire stopping in March
- Communal kitchen refits in March
- Small HMO conversions (3–6 sharers) in March
