HMORefurbishment

Cheshire, England

Rewires and EICR remedials in Northwich

Rewires and EICR remedials in Northwich and the CW9 postcode areas, for landlords and investors with shared houses across Cheshire. Free site visit, then a fixed written quote.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Northwich is 19 miles south-west of Manchester. We price rewires and EICR remedials there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Cheshire, England
Postcodes
CW9
Location
19 miles south-west of Manchester
Pricing region
North West

What do rewires and EICR remedials in Northwich involve?

  • Mains-powered alarm circuits
  • Electrical installation certificates
  • Bathroom and kitchen circuits
  • Extra sockets and USB points in rooms
  • Consumer unit replacement

Which rules apply in Northwich?

Rewires and EICR remedials in Northwich must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in Northwich?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£670 – £1,350house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,750 – £11,500house

These are typical ranges including VAT, adjusted for North West, where costs run below the UK average. The fixed price for a house in Northwich follows a site visit.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Northwich landlords need it?

Typical reasons for this work in Northwich:

  • An EICR with C1, C2 or FI items
  • Converting or adding rooms

Questions about rewires and EICR remedials in Northwich

Is a full rewire disruptive?

Yes. It means lifting floorboards and chasing walls, so it is best done in an empty house or room by room during voids.

How far do you travel from Northwich?

We cover the whole of Cheshire and work UK-wide. For Northwich the nearest towns on our list are Winsford (5 miles), Warrington (10 miles), Runcorn (10 miles).

Where do I check the HMO rules for an address in Northwich?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do rewires and EICR remedials cost in Northwich?

Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Northwich

Other HMO services in Northwich

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote