HMORefurbishment

Essex, England

Rewires and EICR remedials in Harlow

We carry out rewires and EICR remedials in Harlow, 21 miles north-east of London, working to the HMO rules that apply in England and to the council’s written HMO standards.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. In Harlow, a town of around 95,000 people in Essex, the work is planned around the HMO rules for England and the council’s written HMO standards.

Area
Essex, England
Postcodes
CM17, CM18 and CM20
Location
21 miles north-east of London
Pricing region
East of England

What do rewires and EICR remedials in Harlow involve?

  • Bathroom and kitchen circuits
  • Mains-powered alarm circuits
  • Extra sockets and USB points in rooms
  • Emergency lighting circuits
  • Electrical installation certificates

Which rules apply in Harlow?

The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Harlow before we price.

  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in Harlow?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£160 – £420inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£740 – £1,500house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,350 – £12,700house

These are typical ranges including VAT, adjusted for East of England, where costs run above the UK average. The fixed price for a house in Harlow follows a site visit.

How long does it take?

Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Harlow landlords need it?

We usually get the call when:

  • An EICR with C1, C2 or FI items
  • Old wiring or an old fuse board

Questions about rewires and EICR remedials in Harlow

How long do I have to fix EICR items?

In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.

How far do you travel from Harlow?

We cover the whole of Essex and work UK-wide. For Harlow the nearest towns on our list are Hoddesdon (5 miles), Bishops Stortford (7 miles), Waltham Abbey (8 miles).

Does a shared house in Harlow need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do rewires and EICR remedials cost in Harlow?

Our guide ranges for East of England are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Harlow

Other HMO services in Harlow

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote