HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in Glasgow (G1, G2, G3 and G22) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have. Glasgow has a university population, so many shared houses are let to students on yearly tenancies, and summer is the main window for works.
- Area
- Glasgow City, Scotland
- Postcodes
- G1, G2, G3 and G22
- Council
- Glasgow City Council
- Pricing region
- Scotland
What do rewires and EICR remedials in Glasgow involve?
- Electrical installation certificates
- Emergency lighting circuits
- Consumer unit replacement
- Bathroom and kitchen circuits
- EICR remedial works with confirmation
Which rules apply in Glasgow?
Here is what usually applies to a Glasgow job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- An EICR before the first let and at least every 5 years, with C1 and C2 items fixed, PAT testing of supplied appliances and RCD protection.
- Landlords must also be on the Scottish landlord register, renewed every 3 years.
How much do rewires and EICR remedials cost in Glasgow?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £140 – £380 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £660 – £1,350 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £5,700 – £11,400 | house |
These are typical ranges including VAT, adjusted for Scotland, where costs run below the UK average. The fixed price for a house in Glasgow follows a site visit.
How long does it take?
Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.
If the house is let to students, we work backwards from the next tenancy start date in Glasgow.
When do Glasgow landlords need it?
Landlords in Glasgow most often ask us for this when:
- Old wiring or an old fuse board
- An EICR with C1, C2 or FI items
Questions about rewires and EICR remedials in Glasgow
How often does an HMO need an EICR?
At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.
Do you cover all of Glasgow?
Yes. We work across Glasgow and the G1, G2, G3 and G22 postcode areas, plus the rest of Glasgow City. Nearby places we also cover include Rutherglen, Bishopbriggs, Giffnock.
Which council covers HMOs in Glasgow?
Glasgow is covered by Glasgow City Council. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.
How much do rewires and EICR remedials cost in Glasgow?
Our guide ranges for Scotland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near Glasgow
- Rutherglen · 3 mi
- Bishopbriggs · 3 mi
- Giffnock · 4 mi
- Bearsden · 5 mi
- Renfrew · 5 mi
- Cambuslang · 5 mi
- All of Glasgow City
Other HMO services in Glasgow
- Fire alarm and detection systems in Glasgow
- Licence condition and schedule-of-works in Glasgow
- Full HMO refurbishment in Glasgow
- House to HMO conversion in Glasgow
- Bedroom upgrades and room refits in Glasgow
- Escape routes, emergency lighting and fire stopping in Glasgow
- Void and between-tenancy refurbs in Glasgow
- Small HMO conversions (3–6 sharers) in Glasgow
