HMORefurbishment

South Lanarkshire, Scotland

Rewires and EICR remedials in Rutherglen

Rewires and EICR remedials for shared houses in Rutherglen: survey, itemised quote, works and a licence-ready handover, covering G40, G42, G45 and G73.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. In Rutherglen, a town of about 31,000 people in South Lanarkshire, the work is planned around the HMO rules for Scotland and the council’s written HMO standards.

Area
South Lanarkshire, Scotland
Postcodes
G40, G42, G45 and G73
Location
3 miles south-east of Glasgow
Pricing region
Scotland

What do rewires and EICR remedials in Rutherglen involve?

  • Extra sockets and USB points in rooms
  • Emergency lighting circuits
  • Consumer unit replacement
  • Bathroom and kitchen circuits
  • EICR remedial works with confirmation

Which rules apply in Rutherglen?

Rewires and EICR remedials in Rutherglen must satisfy national law for Scotland, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • An EICR before the first let and at least every 5 years, with C1 and C2 items fixed, PAT testing of supplied appliances and RCD protection.
  • Landlords must also be on the Scottish landlord register, renewed every 3 years.

How much do rewires and EICR remedials cost in Rutherglen?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£660 – £1,350house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,700 – £11,400house

Use these as a starting point for budgeting. Access, condition and the council’s requirements in Rutherglen can move the figure either way, which is why we quote after seeing the house.

How long does it take?

Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.

When do Rutherglen landlords need it?

We usually get the call when:

  • Old wiring or an old fuse board
  • Converting or adding rooms

Questions about rewires and EICR remedials in Rutherglen

How often does an HMO need an EICR?

At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.

Do you cover all of Rutherglen?

Yes. We work across Rutherglen and the G40, G42, G45 and G73 postcode areas, plus the rest of South Lanarkshire. Nearby places we also cover include Cambuslang, Glasgow, Giffnock.

Where do I check the HMO rules for an address in Rutherglen?

With the local council for the address. Scottish councils set their own HMO licence standards and planning policies. Every HMO needs a licence, so check the council’s standards before you design the layout.

How much do rewires and EICR remedials cost in Rutherglen?

Our guide ranges for Scotland are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Rutherglen

Other HMO services in Rutherglen

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote