HMO electrical works keep the wiring in a shared house safe and certificated. Fulham is 4 miles south-west of London. We price rewires and EICR remedials there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.
- Area
- Greater London, England
- Postcodes
- SW6
- Location
- 4 miles south-west of London
- Pricing region
- London
What do rewires and EICR remedials in Fulham involve?
- Bathroom and kitchen circuits
- EICR remedial works with confirmation
- Consumer unit replacement
- Full or partial rewires
- Electrical installation certificates
Which rules apply in Fulham?
Rewires and EICR remedials in Fulham must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:
- Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
- Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
How much do rewires and EICR remedials cost in Fulham?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £190 – £510 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £900 – £1,800 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £7,700 – £15,350 | house |
Prices in Fulham are shown with our regional adjustment for London (above the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.
How long does it take?
Allow 1–7 working days on site for a typical job. Drawings, approvals and long-lead items such as kitchens or fire door sets are booked before we start.
When do Fulham landlords need it?
Landlords in Fulham most often ask us for this when:
- Converting or adding rooms
- An EICR with C1, C2 or FI items
Questions about rewires and EICR remedials in Fulham
Is a full rewire disruptive?
Yes. It means lifting floorboards and chasing walls, so it is best done in an empty house or room by room during voids.
Which postcodes in Fulham do you work in?
All of them, including SW6, and the surrounding parts of Greater London.
Does a shared house in Fulham need an HMO licence?
In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.
How much do rewires and EICR remedials cost in Fulham?
Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near Fulham
- Chelsea · 1 mi
- Putney · 2 mi
- Battersea · 2 mi
- Shepherds Bush · 2 mi
- Barnes · 2 mi
- Notting Hill · 2 mi
- All of Greater London
Other HMO services in Fulham
- Fire alarm and detection systems in Fulham
- Licence condition and schedule-of-works in Fulham
- Full HMO refurbishment in Fulham
- House to HMO conversion in Fulham
- Bedroom upgrades and room refits in Fulham
- Escape routes, emergency lighting and fire stopping in Fulham
- Fire doors in Fulham
- Sound insulation in Fulham
