HMORefurbishment

Greater London, England

Rewires and EICR remedials in Harrow

We carry out rewires and EICR remedials in Harrow, 10 miles north-west of London, working to the HMO rules that apply in England and to the council’s written HMO standards.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in Harrow (HA1, HA2 and HA3) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Greater London, England
Postcodes
HA1, HA2 and HA3
Location
10 miles north-west of London
Pricing region
London

What do rewires and EICR remedials in Harrow involve?

  • Emergency lighting circuits
  • Mains-powered alarm circuits
  • Bathroom and kitchen circuits
  • Full or partial rewires
  • Extra sockets and USB points in rooms

Which rules apply in Harrow?

Here is what usually applies to a Harrow job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in Harrow?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£190 – £510inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£900 – £1,800house
Full rewire, 4–5 bedroom house£6,000 – £12,000£7,700 – £15,350house

These are typical ranges including VAT, adjusted for London, where costs run above the UK average. The fixed price for a house in Harrow follows a site visit.

How long does it take?

Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Harrow landlords need it?

We usually get the call when:

  • An EICR with C1, C2 or FI items
  • Old wiring or an old fuse board

Questions about rewires and EICR remedials in Harrow

Is a full rewire disruptive?

Yes. It means lifting floorboards and chasing walls, so it is best done in an empty house or room by room during voids.

How far do you travel from Harrow?

We cover the whole of Greater London and work UK-wide. For Harrow the nearest towns on our list are Brent (2 miles), Wembley (2 miles), Northolt (3 miles).

Does a shared house in Harrow need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do rewires and EICR remedials cost in Harrow?

Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Harrow

Other HMO services in Harrow

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote