HMORefurbishment

Greater London, England

Rewires and EICR remedials in Brent

We carry out rewires and EICR remedials in Brent, 8 miles west of London, working to the HMO rules that apply in England and to the council’s written HMO standards.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Landlords in Brent (HA0 and HA9) usually come to us with a council letter, a fire risk assessment or a house they have just bought. We price from whichever you have.

Area
Greater London, England
Postcodes
HA0 and HA9
Location
8 miles west of London
Council
London Borough of Brent
Pricing region
London

What do rewires and EICR remedials in Brent involve?

  • Mains-powered alarm circuits
  • Bathroom and kitchen circuits
  • Full or partial rewires
  • Consumer unit replacement
  • Electrical installation certificates

Which rules apply in Brent?

Rewires and EICR remedials in Brent must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

London Borough of Brent: local HMO schemes

Article 4 (HMO)In force across the council area Borough-wide Article 4 Direction (C3 to C4) since 1 Nov 2022.
Additional licensingIn force across the council area Borough-wide additional licensing in force 2 Feb 2026 to 1 Feb 2031.
Selective licensingIn force in part of the council area All wards except Wembley Park: Dollis Hill, Harlesden & Kensal Green, Willesden Green 1 Aug 2023-31 Jul 2028; 18 further wards 1 Apr 2024-31 Mar 2029.

Schemes change. Check the council’s current pages for the exact address in Brent before you buy or start work. Source: London Borough of Brent HMO licensing page, checked 2026-10-31.

How much do rewires and EICR remedials cost in Brent?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£190 – £510inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£900 – £1,800house
Full rewire, 4–5 bedroom house£6,000 – £12,000£7,700 – £15,350house

Prices in Brent are shown with our regional adjustment for London (above the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Most jobs of this kind take 1–7 working days. If a council deadline applies in Brent, tell us at the first call so the programme is built around it.

When do Brent landlords need it?

We usually get the call when:

  • Old wiring or an old fuse board
  • An EICR with C1, C2 or FI items

Questions about rewires and EICR remedials in Brent

Is a full rewire disruptive?

Yes. It means lifting floorboards and chasing walls, so it is best done in an empty house or room by room during voids.

Which postcodes in Brent do you work in?

All of them, including HA0 and HA9, and the surrounding parts of Greater London.

Which council covers HMOs in Brent?

Brent is covered by London Borough of Brent. We read the council’s written HMO standards before pricing, and you should check the licence position for the exact address.

How much do rewires and EICR remedials cost in Brent?

Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Brent

Other HMO services in Brent

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote