HMORefurbishment

Greater London, England

Rewires and EICR remedials in Richmond

Planning rewires and EICR remedials in Richmond? We survey, price and build HMO works across Richmond (TW9 and TW10) and the rest of Greater London.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. For a house in Richmond we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.

Area
Greater London, England
Postcodes
TW9 and TW10
Location
8 miles south-west of London
Pricing region
London

What do rewires and EICR remedials in Richmond involve?

  • Mains-powered alarm circuits
  • Extra sockets and USB points in rooms
  • Electrical installation certificates
  • Full or partial rewires
  • Consumer unit replacement

Which rules apply in Richmond?

The rules below are the England-wide position for this kind of work. Councils add their own standards and schemes on top, so we always check the address in Richmond before we price.

  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.

How much do rewires and EICR remedials cost in Richmond?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£190 – £510inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£900 – £1,800house
Full rewire, 4–5 bedroom house£6,000 – £12,000£7,700 – £15,350house

Prices in Richmond are shown with our regional adjustment for London (above the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Richmond landlords need it?

We usually get the call when:

  • Converting or adding rooms
  • An EICR with C1, C2 or FI items

Questions about rewires and EICR remedials in Richmond

How often does an HMO need an EICR?

At least every five years in England, Wales and Scotland, and HMO licence conditions in Northern Ireland ask for the same. Your licence may set extra conditions. Our HMO rules pages for each nation give the details.

Which postcodes in Richmond do you work in?

All of them, including TW9 and TW10, and the surrounding parts of Greater London.

Does a shared house in Richmond need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do rewires and EICR remedials cost in Richmond?

Our guide ranges for London are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Richmond

Other HMO services in Richmond

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote