HMORefurbishment

Greater Manchester, England

Rewires and EICR remedials in Heywood

We carry out rewires and EICR remedials in Heywood, 8 miles north of Manchester, working to the HMO rules that apply in England and to the council’s written HMO standards.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Heywood is 8 miles north of Manchester. We price rewires and EICR remedials there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Greater Manchester, England
Postcodes
M24, OL10 and OL11
Location
8 miles north of Manchester
Pricing region
North West

What do rewires and EICR remedials in Heywood involve?

  • EICR remedial works with confirmation
  • Full or partial rewires
  • Bathroom and kitchen circuits
  • Consumer unit replacement
  • Extra sockets and USB points in rooms

Which rules apply in Heywood?

Rewires and EICR remedials in Heywood must satisfy national law for England, the council’s written HMO standards and, where walls, drainage or fire separation change, the building rules. In short:

  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.

How much do rewires and EICR remedials cost in Heywood?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£140 – £380inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£670 – £1,350house
Full rewire, 4–5 bedroom house£6,000 – £12,000£5,750 – £11,500house

Prices in Heywood are shown with our regional adjustment for North West (below the UK average). Your quote is itemised and fixed in writing once the scope and specification are agreed.

How long does it take?

Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Heywood landlords need it?

Typical reasons for this work in Heywood:

  • Converting or adding rooms
  • Old wiring or an old fuse board

Questions about rewires and EICR remedials in Heywood

Do you issue certificates?

Yes: installation or minor works certificates and written confirmation of remedials, issued by the qualified electrician who did the work.

Which postcodes in Heywood do you work in?

All of them, including M24, OL10 and OL11, and the surrounding parts of Greater Manchester.

Where do I check the HMO rules for an address in Heywood?

With the local council for the address. Councils in England can add additional licensing and Article 4 directions on top of the national rules. Check the council’s website for the exact address before you buy or start work.

How much do rewires and EICR remedials cost in Heywood?

Our guide ranges for North West are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Heywood

Other HMO services in Heywood

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote