HMO electrical works keep the wiring in a shared house safe and certificated. For a house in Stevenage we start with a measured survey, check the council’s written HMO standards for the number of sharers, and then price each item separately.
- Area
- Hertfordshire, England
- Postcodes
- SG1 and SG4
- Location
- 25 miles south-west of Cambridge
- Pricing region
- East of England
What do rewires and EICR remedials in Stevenage involve?
- Electrical installation certificates
- Extra sockets and USB points in rooms
- Consumer unit replacement
- Mains-powered alarm circuits
- EICR remedial works with confirmation
Which rules apply in Stevenage?
Here is what usually applies to a Stevenage job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.
- Electrical installations must be inspected and tested at least every 5 years; remedial work is due within 28 days, or sooner if the report says so.
- Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.
- BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
- Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
How much do rewires and EICR remedials cost in Stevenage?
| Item | UK typical | Local guide | Per |
|---|---|---|---|
| EICR, 5+ bedroom house | £150 – £400 | £160 – £420 | inspection |
| Consumer unit upgrade with RCBOs and AFDDs | £700 – £1,400 | £740 – £1,500 | house |
| Full rewire, 4–5 bedroom house | £6,000 – £12,000 | £6,350 – £12,700 | house |
Use these as a starting point for budgeting. Access, condition and the council’s requirements in Stevenage can move the figure either way, which is why we quote after seeing the house.
How long does it take?
Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.
When do Stevenage landlords need it?
We usually get the call when:
- Converting or adding rooms
- Old wiring or an old fuse board
Questions about rewires and EICR remedials in Stevenage
How long do I have to fix EICR items?
In England, remedial or further investigation work must be done within 28 days, or sooner if the report says so, and you must confirm completion to the tenants and the council.
Do you cover all of Stevenage?
Yes. We work across Stevenage and the SG1 and SG4 postcode areas, plus the rest of Hertfordshire. Nearby places we also cover include Hitchin, Letchworth Garden City, Welwyn Garden City.
Does a shared house in Stevenage need an HMO licence?
In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.
How much do rewires and EICR remedials cost in Stevenage?
Our guide ranges for East of England are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.
Rewires and EICR remedials near Stevenage
- Hitchin · 5 mi
- Letchworth Garden City · 5 mi
- Welwyn Garden City · 7 mi
- Harpenden · 9 mi
- Hertford · 9 mi
- Luton · 9 mi
- All of Hertfordshire
Other HMO services in Stevenage
- Fire alarm and detection systems in Stevenage
- Licence condition and schedule-of-works in Stevenage
- Full HMO refurbishment in Stevenage
- House to HMO conversion in Stevenage
- Bedroom upgrades and room refits in Stevenage
- Escape routes, emergency lighting and fire stopping in Stevenage
- Loft conversions for extra rooms in Stevenage
- Ensuite installation in Stevenage