HMORefurbishment

Kent, England

Rewires and EICR remedials in Sevenoaks

Rewires and EICR remedials for shared houses in Sevenoaks: survey, itemised quote, works and a licence-ready handover, covering TN13 and TN15.

Electrician fitting a new metal consumer unit with RCBOs

HMO electrical works keep the wiring in a shared house safe and certificated. Sevenoaks is 21 miles south-east of London. We price rewires and EICR remedials there against England’s HMO rules and the council’s written HMO standards, so work is planned to the standard an inspection looks for.

Area
Kent, England
Postcodes
TN13 and TN15
Location
21 miles south-east of London
Pricing region
South East

What do rewires and EICR remedials in Sevenoaks involve?

  • EICR remedial works with confirmation
  • Consumer unit replacement
  • Bathroom and kitchen circuits
  • Electrical installation certificates
  • Mains-powered alarm circuits

Which rules apply in Sevenoaks?

Here is what usually applies to a Sevenoaks job of this kind. It is general information rather than legal advice, and the council’s written HMO standards have the final detail.

  • BS 7671, the wiring standard, calls for arc fault detection devices in HMOs on new socket circuits, such as rewires and consumer unit changes.
  • Mandatory HMO licence for 5 or more people in 2 or more households (since October 2018); councils can add additional licensing for smaller HMOs.
  • Licences last up to 5 years and carry conditions on gas and electrical safety, alarms, room sizes and waste.
  • Under the Renters’ Rights Act, civil penalties reach £40,000 for offences such as running an unlicensed HMO.

How much do rewires and EICR remedials cost in Sevenoaks?

ItemUK typicalLocal guidePer
EICR, 5+ bedroom house£150 – £400£170 – £450inspection
Consumer unit upgrade with RCBOs and AFDDs£700 – £1,400£780 – £1,550house
Full rewire, 4–5 bedroom house£6,000 – £12,000£6,700 – £13,450house

These are typical ranges including VAT, adjusted for South East, where costs run above the UK average. The fixed price for a house in Sevenoaks follows a site visit.

How long does it take?

Typical time on site: 1–7 working days. We agree the programme with you before starting and send photo updates as the work progresses.

When do Sevenoaks landlords need it?

Landlords in Sevenoaks most often ask us for this when:

  • An EICR with C1, C2 or FI items
  • Old wiring or an old fuse board

Questions about rewires and EICR remedials in Sevenoaks

Do you issue certificates?

Yes: installation or minor works certificates and written confirmation of remedials, issued by the qualified electrician who did the work.

Which postcodes in Sevenoaks do you work in?

All of them, including TN13 and TN15, and the surrounding parts of Kent.

Does a shared house in Sevenoaks need an HMO licence?

In England, a mandatory licence is needed for 5 or more people from 2 or more households. Smaller HMOs can need a licence where the council runs additional licensing, which is common in towns with many shared houses. Check the council’s website for the address.

How much do rewires and EICR remedials cost in Sevenoaks?

Our guide ranges for South East are in the table on this page, and the guide-price tool gives a figure for your house. A fixed written quote follows a free site visit.

Rewires and EICR remedials near Sevenoaks

Other HMO services in Sevenoaks

Planning HMO works?

Free site visit, then a fixed written quote itemised against your council’s standards.

CallGet a quote